Procedure
.
2. Extend the server from the rack
.
3.
Disconnect the cabling and remove the server from the rack. For more information, see the documentation
that ships with the rack mounting option.
4.
Place the server on a sturdy, level surface.
Access the product rear panel
Releasing the cable management arm
Release the cable management arm and then swing the arm away from the rack.
Accessing the Systems Insight Display
The Systems Insight Display is only supported on SFF models. To access a Systems Insight Display, use the
following procedure.
Procedure
1.
Press and release the panel.
2.
After the display fully ejects, rotate the display to view the LEDs.
Removal and replacement procedures
43
Содержание ProLiant DL388 Gen10
Страница 37: ...Customer self repair 37...
Страница 38: ...38 Customer self repair...
Страница 39: ...Customer self repair 39...
Страница 83: ...6 Remove the cable protection panel 7 Remove the chassis ear Removal and replacement procedures 83...
Страница 147: ...Option 1 System board Option 2 Controller Option 3 not shown SAS Expander Cabling 147...
Страница 149: ...Box 1 to SAS Expander Box 2 to SAS Expander Cabling 149...
Страница 150: ...All boxes Cable routing Front 8SFF NVMe SAS premium drive option The backplane shown is in box 3 150 Cabling...
Страница 151: ...Cable routing Front 8SFF NVMe drive options Box 1 Box 2 Cabling 151...
Страница 152: ...Box 3 Cable routing Front 2SFF NVMe drive option for SFF 152 Cabling...
Страница 153: ...Cable routing Front 2SFF NVMe drive option for LFF Cable routing Midplane 4LFF drive option Cabling 153...