Prerequisites
Before installing this option, be sure that you have the following the components included with the
hardware option kit.
For more information on specific options, see the server blade QuickSpecs on the Hewlett Packard
Enterprise website (
Procedure
1.
on page 21.
2.
on page 22.
3.
Place the server blade on a flat, level work surface.
4.
on page 22.
IMPORTANT:
When removing a DIMM baffle, do not remove the following options when
installed on the DIMM baffle:
• M.2 enablement option (left DIMM baffle)
• HPE Smart Storage Battery (right DIMM baffle)
5.
on page 23.
6.
Open the appropriate DIMM slot latches.
7.
Install the DIMM.
8.
on page 25.
9.
on page 23.
on page 42.
on page 21.
To configure the memory mode, use the BIOS/Platform Configuration (RBSU) in the UEFI System
Utilities.
Hardware options installation
61