![HP StorageWorks 2/140 - Director Switch Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/hp/storageworks-2-140-director-switch/storageworks-2-140-director-switch_installation-manual_165327048.webp)
Installing and Configuring the Director
48
Director 2/140 Installation Guide
Figure 12: Securing the front mounting brackets to the Director 2/140
3. Locate the two rear mounting plates in the shipping carton.
4. Secure the two rear mounting plates to each side of the director, as shown in
. For each plate, use three (3) screws.
Inserting Cage Nuts in the Rack
Before placing the director into the rack, insert the cage nuts into the appropriate
locations along the exterior vertical rack rails. Read the following sections for
instructions on inserting front and rear cage nuts in the rack.
Inserting the Front Cage Nuts in the Rack
Use these steps to insert the six (6) supplied cage nuts in the rack’s front rails.
1. Select one of the exterior vertical rails at the front of the cabinet. From the
bottom of the shelf bracket, count up 3U (9 holes) and insert the first of three
cage nuts.
2. Count up 3U (9 holes) from the cage nut you just installed and insert the next
cage nut.
3. Count up 3U (9 holes) from the second cage nut and insert the third cage nut.
4. To install cage nuts in the other front rail, repeat
step 1
through
step 3
.