
Installation and Configuration
18
1/16 Tape SuperLoader Reference Guide
Figure 12: Rear U-channel bracket screws
14. If additional options are going to be installed, remove the optional installation
brackets:
a.
Remove the two screws securing each bracket to the front of the rack.
b.
Pull the bracket forward and down, then push back to release the rear tabs.
c.
Remove the rail from the rack.
Caution:
To avoid personal injury or damage to the equipment, be sure that
the optional installation brackets or other properly installed rack options are in
place below the SuperLoader at all times.
Note:
Be sure to save the optional installation brackets in a safe place for use if the
SuperLoader needs to be removed.
Содержание StorageWorks 1/16 Tape SuperLoader
Страница 8: ...Contents viii 1 16 Tape SuperLoader Reference Guide ...
Страница 14: ...About this Guide xiv 1 16 Tape SuperLoader Reference Guide ...
Страница 22: ...Overview 8 1 16 Tape SuperLoader Reference Guide ...
Страница 56: ...Installation and Configuration 42 1 16 Tape SuperLoader Reference Guide ...
Страница 104: ...SuperLoader Operation 90 1 16 Tape SuperLoader Reference Guide ...
Страница 112: ...Tape Drive Cleaning 98 1 16 Tape SuperLoader Reference Guide ...
Страница 122: ...Troubleshooting 108 1 16 Tape SuperLoader Reference Guide ...
Страница 127: ...Regulatory Compliance Notices 113 1 16 Tape SuperLoader Reference Guide Taiwan Notice Japanese Notice ...
Страница 128: ...Regulatory Compliance Notices 114 1 16 Tape SuperLoader Reference Guide ...
Страница 134: ...Specifications 120 1 16 Tape SuperLoader Reference Guide ...
Страница 146: ...Index 132 1 16 Tape SuperLoader Reference Guide ...