Table 4-2 Factory-Integrated Installation Checklist
(continued)
COMPLETED
IN-PROCESS
PROCEDURE
Verify presence of cells
Power on cabinet (48 V)
Verify system configuration and
set boot parameters
Set automatic system restart
Boot partitions
Configure remote login (if
required). See Appendix B.
Verify remote link (if required)
Install non-factory, integrated
I/O cards (if required)
Select PCI card slot
Install PCI card
Verify installation
Route cables using the cable
management arm
Install other peripherals (if
required)
Perform visual inspection and
complete installation
Set up network services (if
required)
Enable iCOD (if available)
Final inspection of circuit boards
Final inspection of cabling
Area cleaned and debris and
packing materials disposed of
Account for tools
Dispose of parts and other items
Make entry in Gold Book
(recommended)
Customer acceptance and signoff
(if required)
66
Cabling and Powering the Server
Содержание rp7420
Страница 3: ......
Страница 4: ......
Страница 12: ...12 ...
Страница 16: ...16 ...
Страница 30: ...Figure 1 12 Left Rear View of HP 9000 rp7420 server 30 Overview ...
Страница 40: ...40 ...
Страница 50: ...50 ...
Страница 82: ...82 ...
Страница 106: ...Figure 6 25 Front Panel Board Cable Location on Backplane 106 Removing and Replacing Server Components ...
Страница 108: ...108 ...
Страница 119: ...Figure D 3 Planning Grid Computer Room Layout Plan 119 ...
Страница 120: ...Figure D 4 Planning Grid 120 Site Preparation Guidelines ...
Страница 121: ...Figure D 5 Planning Grid Computer Room Layout Plan 121 ...
Страница 122: ...Figure D 6 Planning Grid 122 Site Preparation Guidelines ...
Страница 123: ...Figure D 7 Planning Grid Computer Room Layout Plan 123 ...
Страница 124: ...124 ...
Страница 127: ...X XD 115 127 ...