
Figure 2-11 Lift Handles Mounted
6.
Continue to pull the handles apart until the spring plunger snaps into final position. The
spring plunger drops down into the recess position.
7.
Ensure that the handles are secure by pressing the handles together and moving back and
forth.
8.
For the other handle, repeat steps 3 through 7.
9.
To lift the server, rotate the handles 90 degrees to horizontal position.
NOTE:
If installing the system in a rack, see the Installation Guide, HP J1530B Rack Installation
Kit.
10. After moving the server, remove the lift handle panels from the chassis and reinstall the
server covers and front bezel. Refer to the installation guide, HP J1530B rack installation kit.
Installing the Server Into the Rack
Any server that is to be installed into a rack is shipped with equipment slides. With every set of
slides comes an installation guide: Installation Guide, HP J1530B Rack Installation Kit.
Installing the Server Into the Rack
39
Содержание rp7420
Страница 3: ......
Страница 4: ......
Страница 12: ...12 ...
Страница 16: ...16 ...
Страница 30: ...Figure 1 12 Left Rear View of HP 9000 rp7420 server 30 Overview ...
Страница 40: ...40 ...
Страница 50: ...50 ...
Страница 82: ...82 ...
Страница 106: ...Figure 6 25 Front Panel Board Cable Location on Backplane 106 Removing and Replacing Server Components ...
Страница 108: ...108 ...
Страница 119: ...Figure D 3 Planning Grid Computer Room Layout Plan 119 ...
Страница 120: ...Figure D 4 Planning Grid 120 Site Preparation Guidelines ...
Страница 121: ...Figure D 5 Planning Grid Computer Room Layout Plan 121 ...
Страница 122: ...Figure D 6 Planning Grid 122 Site Preparation Guidelines ...
Страница 123: ...Figure D 7 Planning Grid Computer Room Layout Plan 123 ...
Страница 124: ...124 ...
Страница 127: ...X XD 115 127 ...