Table 4-2 Factory-Integrated Installation Checklist
(continued)
COMPLETED
IN-PROCESS
PROCEDURE
Inspect shipping containers for
damage
Unpack SPU cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and
remove the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp
Unpack the peripheral cabinet
(if ordered)
Unpack other equipment
Remove and dispose of
packaging material
Move cabinet(s) and equipment
to computer room
Move cabinets into final position
Position cabinets next to
each other (approximately
1/2 inch)
Adjust leveling feet
Install anti-tip plates
Inspect cables for proper
installation
Set up CE tool and connect to
Remote RS-232 port on MP
Apply power to cabinet
(housekeeping)
Check power to BPSs
Log in to the MP
Set LAN IP address on the MP
Connect customer console
Set up network on customer
console
Verify LAN connection
Using the Checklist
65
Содержание rp7420
Страница 3: ......
Страница 4: ......
Страница 12: ...12 ...
Страница 16: ...16 ...
Страница 30: ...Figure 1 12 Left Rear View of HP 9000 rp7420 server 30 Overview ...
Страница 40: ...40 ...
Страница 50: ...50 ...
Страница 82: ...82 ...
Страница 106: ...Figure 6 25 Front Panel Board Cable Location on Backplane 106 Removing and Replacing Server Components ...
Страница 108: ...108 ...
Страница 119: ...Figure D 3 Planning Grid Computer Room Layout Plan 119 ...
Страница 120: ...Figure D 4 Planning Grid 120 Site Preparation Guidelines ...
Страница 121: ...Figure D 5 Planning Grid Computer Room Layout Plan 121 ...
Страница 122: ...Figure D 6 Planning Grid 122 Site Preparation Guidelines ...
Страница 123: ...Figure D 7 Planning Grid Computer Room Layout Plan 123 ...
Страница 124: ...124 ...
Страница 127: ...X XD 115 127 ...