Removal and replacement procedures 51
c.
Finish the installation by completely tightening the screws in the same sequence.
7.
Install the processor air baffle.
8.
Install the front GPU bracket.
9.
Install the interposer board assembly.
10.
Install the front GPU cage.
11.
Install the server into the chassis.
12.
Connect the peripheral cables.
13.
Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
System board
To remove the component:
1.
Power down the server (on page
2.
Disconnect all peripheral cables from the server.
3.
Remove the server from the chassis (on page
4.
Remove the front GPU cage (on page
5.
Remove the interposer board assembly (on page
6.
Remove the front GPU bracket (on page
7.
Remove the SFF hot-plug drive cage (on page
8.
Remove the PCI riser cage (on page
9.
Remove the FlexibleLOM riser cage (on page
10.
Remove the processor air baffle ("
" on page
11.
Remove all DIMMs ("
" on page
12.
Remove the heatsink:
Содержание ProLiant SL250s Gen8
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 72: ...Component identification 72 Item LED Status Definition Off The drive is not configured by a RAID controller ...
Страница 74: ...Cabling 74 SFF hot plug drive cage Front quick release cage Left node ...
Страница 75: ...Cabling 75 Right node Rear quick release drive cage Left node ...
Страница 78: ...Cabling 78 Mini SAS cabling SFF hot plug drive cage Front quick release drive cage Left node ...
Страница 79: ...Cabling 79 Right node Rear quick release drive cage Left node ...
Страница 80: ...Cabling 80 Right node FBWC capacitor pack cabling Left node ...
Страница 81: ...Cabling 81 Right node ...