Hardware options installation 90
6.
Install the foot blanks.
7.
Remove the access panel (on page
26
).
8.
Align the pins on the rack bezel with the corresponding slots on the chassis. Secure the rack bezel to the
chassis using the screws inside the chassis.
9.
Install the access panel (on page
27
).
10.
Install the server into the rack ("
Installing the server into the rack
" on page
35
).
Содержание PROLIANT ML350 G6
Страница 81: ...Hardware options installation 81 7 Install the FBWC module 8 Connect the cable 9 Install the capacitor pack ...
Страница 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Страница 112: ...Troubleshooting 112 ...
Страница 130: ...Server specifications 130 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 137: ...Technical support 137 ...
Страница 138: ...Technical support 138 ...
Страница 145: ...Index 145 W warnings 33 103 website HP 131 ...