
7.
Disconnect all cables connected to the SAS expander card.
8.
Remove the primary PCIe riser cage (
Removing and replacing a PCIe riser cage
on page 51).
9.
Remove the SAS expander card.
Removing and replacing a riser board
CAUTION:
To prevent damage to the server or expansion boards, power down the server and remove all AC power
cords before removing or installing the PCIe riser cage.
Procedure
1.
Power down the server (
on page 33).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack (
Extend the server from the rack
on page 33).
• Remove the server from the rack (
Removing the server from the rack
on page 34).
4.
Remove the access panel (
on page 35).
5.
Disconnect all cables attached to the expansion boards in the PCIe riser cage.
6.
Remove the PCIe riser cage (
Removing and replacing a PCIe riser cage
7.
If installed, remove the expansion boards. (
Removing and replacing an expansion board
8.
Remove the riser board installed in the riser cage.
The primary PCIe riser cage is shown. Your riser board might appear different.
Removing and replacing a riser board
55
Содержание ProLiant DL560 Gen10
Страница 6: ...Warranty information 124 Regulatory information 125 Documentation feedback 125 6 Contents ...
Страница 27: ...Customer self repair 27 ...
Страница 28: ...28 Customer self repair ...
Страница 29: ...Customer self repair 29 ...
Страница 30: ...30 Customer self repair ...
Страница 79: ...Eight bay SFF NVMe drive cage Two bay NVMe Six bay SFF HDD drive cage Component identification 79 ...
Страница 102: ...16 SFF backplanes Group C SAS cables 102 Cabling ...
Страница 104: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board 104 Cabling ...
Страница 105: ...Connected to the system board SATA ports 1 and 2 Connected to the HPE P816i a Smart Array controller Cabling 105 ...
Страница 107: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board Cabling 107 ...
Страница 108: ...Connected to the system board SATA ports 1 and 2 Connected to the Smart Array controller 108 Cabling ...
Страница 109: ...Drive box 3 cabling Connected to the Primary PCIe riser board Connected to the secondary PCIe riser board Cabling 109 ...
Страница 110: ...Connected to the system board SATA ports 1 and 2 Connected to an HPE Smart Array controller 110 Cabling ...
Страница 113: ...Quad slimline riser installed in the secondary PCIe riser cage Tertiary riser Cabling 113 ...