Releasing the cable management arm
Release the cable management arm and then swing the arm away from the rack.
Removing the access panel
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION:
To prevent damage to electrical components, take the appropriate anti-static precautions before
beginning any installation, removal, or replacement procedure. Improper grounding can cause
electrostatic discharge.
Releasing the cable management arm
35
Содержание ProLiant DL560 Gen10
Страница 6: ...Warranty information 124 Regulatory information 125 Documentation feedback 125 6 Contents ...
Страница 27: ...Customer self repair 27 ...
Страница 28: ...28 Customer self repair ...
Страница 29: ...Customer self repair 29 ...
Страница 30: ...30 Customer self repair ...
Страница 79: ...Eight bay SFF NVMe drive cage Two bay NVMe Six bay SFF HDD drive cage Component identification 79 ...
Страница 102: ...16 SFF backplanes Group C SAS cables 102 Cabling ...
Страница 104: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board 104 Cabling ...
Страница 105: ...Connected to the system board SATA ports 1 and 2 Connected to the HPE P816i a Smart Array controller Cabling 105 ...
Страница 107: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board Cabling 107 ...
Страница 108: ...Connected to the system board SATA ports 1 and 2 Connected to the Smart Array controller 108 Cabling ...
Страница 109: ...Drive box 3 cabling Connected to the Primary PCIe riser board Connected to the secondary PCIe riser board Cabling 109 ...
Страница 110: ...Connected to the system board SATA ports 1 and 2 Connected to an HPE Smart Array controller 110 Cabling ...
Страница 113: ...Quad slimline riser installed in the secondary PCIe riser cage Tertiary riser Cabling 113 ...