
CAUTION:
Do not operate the server for long periods with the access panel open or removed. Operating the server
in this manner results in improper airflow and improper cooling that can lead to thermal damage.
Prerequisites
A T-10 Torx screwdriver might be needed to unlock the access panel.
Procedure
1.
Power down the server (
on page 33).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack (
Extend the server from the rack
on page 33).
• Remove the server from the rack (
Removing the server from the rack
on page 34).
4.
If the locking latch is locked, use a T-10 Torx screwdriver to unlock the latch.
5.
Open the locking latch.
The access panel slides back, releasing it from the chassis.
6.
Lift and remove the access panel.
Turn the access panel over to locate the server label. This label provides convenient access to component
identification and LED status indicators.
Removing the bezel
Procedure
Remove the component as indicated.
36
Removing the bezel
Содержание ProLiant DL560 Gen10
Страница 6: ...Warranty information 124 Regulatory information 125 Documentation feedback 125 6 Contents ...
Страница 27: ...Customer self repair 27 ...
Страница 28: ...28 Customer self repair ...
Страница 29: ...Customer self repair 29 ...
Страница 30: ...30 Customer self repair ...
Страница 79: ...Eight bay SFF NVMe drive cage Two bay NVMe Six bay SFF HDD drive cage Component identification 79 ...
Страница 102: ...16 SFF backplanes Group C SAS cables 102 Cabling ...
Страница 104: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board 104 Cabling ...
Страница 105: ...Connected to the system board SATA ports 1 and 2 Connected to the HPE P816i a Smart Array controller Cabling 105 ...
Страница 107: ...Connected to the secondary PCIe riser board Connected to the tertiary PCIe riser board Cabling 107 ...
Страница 108: ...Connected to the system board SATA ports 1 and 2 Connected to the Smart Array controller 108 Cabling ...
Страница 109: ...Drive box 3 cabling Connected to the Primary PCIe riser board Connected to the secondary PCIe riser board Cabling 109 ...
Страница 110: ...Connected to the system board SATA ports 1 and 2 Connected to an HPE Smart Array controller 110 Cabling ...
Страница 113: ...Quad slimline riser installed in the secondary PCIe riser cage Tertiary riser Cabling 113 ...