Setup and Installation of the Packaged Cluster
Powering Down and Preparing for Transfer
1.
Shut down the operating system and power off each server.
2.
Power off the storage system.
3.
Remove the power cords and return them to the original boxes.
4.
Disconnect the VHDCI SCSI cables and the Ethernet crossover cable from the
servers.
5.
Disconnect all other cables from the servers.
6.
Replace the protective covers on the ends of the VHDCI SCSI cables.
7.
Secure the VHDCI SCSI cables and the Ethernet crossover cable for transfer.
8.
Repack the shipping components in their original configuration. Refer to the
exploded view diagram and pictures on the packaged cluster poster as a guideline
for repacking.
Configuration is complete. The packaged cluster is ready for transfer.
2-16
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
HP CONFIDENTIAL
Codename: Sopwith Part Number: 252621-002 Last Saved On: 11/8/02 1:59 PM