
Removal and replacement procedures 78
Figure 65
Inserting the Spacer
3.
Insert the dedicated management port into the dedicated management port connector.
4.
Tighten the screw clockwise to secure the dedicated management port to the system board.
Figure 66
Reinstalling the Dedicated management port
System battery
The server uses nonvolatile memory that requires a system battery to retain system information when
power is removed.
This 3 V lithium coin cell battery is located on the system board.
Содержание ProLiant DL160se - G6 Server
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 20: ...Illustrated parts catalog 20 ...
Страница 55: ...Removal and replacement procedures 55 Figure 31 Reinstalling the Backplane 3 Install all cables ...