2-20
Installing the HP 5400 zl Switches
Installation Procedures
Installing the HP 5400 zl
Switches
Power Supply Shelf LEDs
The EPS LEDs are duplicated on the front and back of the device. The
following graphic shows an example of the front of the EPS. There are two
dual colored (green/orange) LEDs for each EPS port:
■
Device Connected
■
Power Status
Power
Supply
Status
EPS Port
Status
E1
E2
ProCurve Switch zl
Power Supply Shelf
J8714A
Power
Fault
Device Connected
Power Status
PoE
Fault
Power
Device Connected LEDs
Power Status LEDs
Figure 2-12. Power Supply Shelf LEDs
Connecting the Power Supply Shelf
To Power
Source
EPS Cables
To Power
Source
5406 zl
Figure 2-13. Connecting the EPS to one 5406 zl switch
Содержание ProCurve 5400zl Series
Страница 1: ...HP 5400 zl Switches Installation and Getting Started Guide Power over Ethernet ...
Страница 2: ......
Страница 3: ...HP 5400 zl Switches Installation and Getting Started Guide ...
Страница 10: ......
Страница 60: ......
Страница 93: ...5 15 Troubleshooting HP Customer Support Services Troubleshooting ...
Страница 94: ...5 16 Troubleshooting HP Customer Support Services Troubleshooting ...
Страница 110: ......
Страница 111: ...B 13 Cabling and Technology Information Twisted Pair Cable Connector Pin Outs Cabling and Technology Information ...
Страница 118: ...C 7 Safety and Regulatory Statements Safety Information Japan Safety and Regulatory Statements Safety Information Japan ...
Страница 119: ...C 8 Safety and Regulatory Statements Safety Information China Safety and Regulatory Statements Safety Information China ...
Страница 123: ...C 12 Safety and Regulatory Statements EMC Regulatory Statements Safety and Regulatory Statements ...
Страница 134: ......