tighten the four screws
2-12
Installing the HP 5400 zl Switches
Installation Procedures
Installing the HP 5400 zl
Switches
Figure 2-4. Back of switch with power supply fully installed
4. Verify the Switch Passes Self Test
After you have installed any modules and the optional second power supply,
but before mounting the switch in its network location, you should first verify
it is working properly by plugging it into a power source and verifying it passes
its self test.
If you have installed a second power supply, repeat these procedures with the
second power supply to verify it works correctly also.
1.
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
Connect power cord to
power connector
Figure 2-5. Power connector on back of switch
Содержание ProCurve 5400zl Series
Страница 1: ...HP 5400 zl Switches Installation and Getting Started Guide Power over Ethernet ...
Страница 2: ......
Страница 3: ...HP 5400 zl Switches Installation and Getting Started Guide ...
Страница 10: ......
Страница 60: ......
Страница 93: ...5 15 Troubleshooting HP Customer Support Services Troubleshooting ...
Страница 94: ...5 16 Troubleshooting HP Customer Support Services Troubleshooting ...
Страница 110: ......
Страница 111: ...B 13 Cabling and Technology Information Twisted Pair Cable Connector Pin Outs Cabling and Technology Information ...
Страница 118: ...C 7 Safety and Regulatory Statements Safety Information Japan Safety and Regulatory Statements Safety Information Japan ...
Страница 119: ...C 8 Safety and Regulatory Statements Safety Information China Safety and Regulatory Statements Safety Information China ...
Страница 123: ...C 12 Safety and Regulatory Statements EMC Regulatory Statements Safety and Regulatory Statements ...
Страница 134: ......