2-12
Installing the Switch
Installation Procedures
Installing the S
w
it
ch
2.
Check the LEDs on the switch as described below.
When the switch is powered on, it performs its diagnostic self test. Self
test takes approximately 50 seconds to complete.
LED Behavior:
During the self test:
•
Initially, all the status, LED Mode and port LEDs are on for most of
the duration of the test.
•
Most of the LEDs go off and then may come on again during phases
of the self test. For the duration of the self test, the Test LED stays on.
ProCurve Switch 3400cl-24G
Power and
Fault LEDs
Switch port LEDs
Test LED
Switch port LEDs
Power and
Fault LEDs
ProCurve Switch 3400cl-48G
Test LED
Содержание ProCurve 3400cl-24G
Страница 1: ...Installation and Getting Started Guide www procurve com ProCurve Series 3400cl Switches ...
Страница 2: ......
Страница 3: ...ProCurve Series 3400cl Switch Installation and Getting Started Guide ...
Страница 52: ... This page is intentionally unused ...
Страница 72: ... This page is intentionally unused ...
Страница 84: ... This page is intentionally unused ...
Страница 104: ...6 Index Index V VT 100 terminal serial cable connection for 2 25 W wiring rules for twisted pair cables B 5 ...
Страница 105: ... This page is intentionally unused ...
Страница 106: ... This page is intentionally unused ...
Страница 107: ......