Installing the chassis 30
•
Always install the switch module and the uplink module in corresponding bays. Both components must
be installed for normal operation.
•
The switch module and the uplink module can be installed in any order.
•
The switch module and the uplink module power down when either module is removed from the chassis.
•
The switch module and the uplink module power up after both modules are installed in the chassis.
•
Removing any component from bay A or bay B does not disrupt traffic for the other switch assembly.
•
For the most current product information, see the release notes in the HP Moonshot Information Library
•
Always use the HP recommended firmware version.
For more information on HP recommended firmware versions, see the HP Moonshot Component Pack
download website •
The first NIC port discovered by the operating system routes traffic through switch A. The second NIC
port discovered by the operating system routes traffic through switch B.