Appendix C
General Site Preparation Guidelines
Site Inspection
210
16
Does the input frequency correspond to
equipment specifications?
17.
Are lightning arrestors installed inside the
building?
18.
Is power conditioning equipment installed?
19.
Is there a dedicated branch circuit for
equipment?
20.
Is the dedicated branch circuit less than 250
feet (72.5 meters)?
21.
Are the input circuit breakers adequate for
equipment loads?
Safety
No.
Area or condition
Yes
No
22.
Is there an emergency power shut-off switch?
23.
Is there a telephone available for emergency
purposes?
24.
Is there a fire protection system in the
computer room?
25.
Is antistatic flooring installed?
26.
Are there any equipment servicing hazards
(loose ground wires, poor lighting, etc.)?
Cooling
No.
Area or condition
Yes
No
27.
Can cooling be maintained between 20
°
C and
55
°
C (up to 5000 ft.)? Derate 1
°
C/1000 ft.
above 5000 ft. and up to 10,000 ft.
28.
Can temperature changes be held to
10
°
C per
hour with tape media? Can temperature
changes be held to 20
°
C per hour without tape
media?
29.
Can humidity level be maintained at 40% to
60% at 35
°
C noncondensing?
30.
Are air conditioning filters installed and clean?
Storage
Table C-5
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
Comment
or Date
Содержание L1000 - 9000 - 0 MB RAM
Страница 7: ...Contents vii Typical Installation Schedule 207 Site Inspection 208 Delivery Survey 212 ...
Страница 8: ...Contents viii ...
Страница 10: ...Tables x ...
Страница 12: ...Figures xii ...
Страница 14: ...xiv ...
Страница 16: ...Chapter 1 Server Overview 2 ...
Страница 17: ...Chapter 2 3 2 Server Unpacking and Installation ...
Страница 37: ...Chapter 3 23 3 Installing Additional Components ...
Страница 60: ...Chapter 3 Installing Additional Components Installing Disk Drives 46 ...
Страница 61: ...Chapter 4 47 4 Cable Connections ...
Страница 91: ...Chapter 5 77 5 Utilities ...
Страница 98: ...Chapter 5 Utilities Configuring the Rev B Guardian Service Processor GSP 84 ...
Страница 99: ...Chapter 6 85 6 Troubleshooting ...
Страница 134: ...Chapter 6 Troubleshooting Fan Power Supply and Disk LED States 120 ...
Страница 189: ...Appendix A 175 A Parts and Accessories ...
Страница 195: ...Appendix B 181 B System Specifications ...