
Chapter 2
Server Unpacking and Installation
Factory Integrated rp54xx Cabinet Installation
4
Factory Integrated rp54xx Cabinet Installation
A factory integrated server is one in which the rp54xx server and associated components are pre-assembled
and shipped from the factory already installed in a Hewlett-Packard E-Series cabinet. Factory integrated
systems reduce the amount of time required to set-up and begin server operation.
1. Carefully remove the carton and anti-static bag from the pallet.
2. Remove the front two (2) L-brackets. Retain the 1/2-inch bolts for later use.
NOTE
As viewed from the front, one bracket is located on each side at the base of the cabinet near
the front.
Rear
Front
1
1
2
3
1. Shipping L-Bracket
2. Shipping Pallet
3. Cabinet (Top View)
Содержание L1000 - 9000 - 0 MB RAM
Страница 7: ...Contents vii Typical Installation Schedule 207 Site Inspection 208 Delivery Survey 212 ...
Страница 8: ...Contents viii ...
Страница 10: ...Tables x ...
Страница 12: ...Figures xii ...
Страница 14: ...xiv ...
Страница 16: ...Chapter 1 Server Overview 2 ...
Страница 17: ...Chapter 2 3 2 Server Unpacking and Installation ...
Страница 37: ...Chapter 3 23 3 Installing Additional Components ...
Страница 60: ...Chapter 3 Installing Additional Components Installing Disk Drives 46 ...
Страница 61: ...Chapter 4 47 4 Cable Connections ...
Страница 91: ...Chapter 5 77 5 Utilities ...
Страница 98: ...Chapter 5 Utilities Configuring the Rev B Guardian Service Processor GSP 84 ...
Страница 99: ...Chapter 6 85 6 Troubleshooting ...
Страница 134: ...Chapter 6 Troubleshooting Fan Power Supply and Disk LED States 120 ...
Страница 189: ...Appendix A 175 A Parts and Accessories ...
Страница 195: ...Appendix B 181 B System Specifications ...