
Appendix C
General Site Preparation Guidelines
Site Inspection
209
Table C-5
Site Inspection Checklist
Please check either Yes or No. If No, include comment# or date
Comment
or Date
Computer room
No.
Area or condition
Yes
No
1.
Is there a completed floor plan?
2.
Is there adequate space for maintenance needs?
Front 36 in (91.4 cm) minimum, Rear 36 in
(91.4 cm) minimum are recommended
clearances.
3.
Is access to the site or computer room
restricted?
4.
Is the computer room structurally complete?
Expected date of completion?
5.
Is a raised floor installed and in good condition?
6.
Is the raised floor adequate for equipment
loading?
7.
Are there channels or cutouts for cable routing?
8.
Is there a remote console telephone line
available with an RJ11 jack?
9.
Is a telephone line available?
10.
Are customer supplied peripheral cables and
LAN cables available and of the proper type?
11.
Are floor tiles in good condition and properly
braced?
12.
Is floor tile underside shiny or painted? If
painted, judge the need for particulate test.
Power and lighting
No.
Area or condition
Yes
No
13.
Are lighting levels adequate for maintenance?
14.
Are there AC outlets available for servicing
needs? (i.e. vacuuming)
15.
Does the input voltage correspond to equipment
specifications?
15A
Is dual source power used? If so, identify type(s)
and evaluate grounding.
Содержание L1000 - 9000 - 0 MB RAM
Страница 7: ...Contents vii Typical Installation Schedule 207 Site Inspection 208 Delivery Survey 212 ...
Страница 8: ...Contents viii ...
Страница 10: ...Tables x ...
Страница 12: ...Figures xii ...
Страница 14: ...xiv ...
Страница 16: ...Chapter 1 Server Overview 2 ...
Страница 17: ...Chapter 2 3 2 Server Unpacking and Installation ...
Страница 37: ...Chapter 3 23 3 Installing Additional Components ...
Страница 60: ...Chapter 3 Installing Additional Components Installing Disk Drives 46 ...
Страница 61: ...Chapter 4 47 4 Cable Connections ...
Страница 91: ...Chapter 5 77 5 Utilities ...
Страница 98: ...Chapter 5 Utilities Configuring the Rev B Guardian Service Processor GSP 84 ...
Страница 99: ...Chapter 6 85 6 Troubleshooting ...
Страница 134: ...Chapter 6 Troubleshooting Fan Power Supply and Disk LED States 120 ...
Страница 189: ...Appendix A 175 A Parts and Accessories ...
Страница 195: ...Appendix B 181 B System Specifications ...