2-12
Installing the Switch 4200vl Series
Installation Procedures
In
sta
llin
g
th
e
Switc
h
4200vl
Se
ri
es
4. Verify the Switch Passes Self Test
After you have installed any modules and the optional second power supply,
but before mounting the switch in its network location, you should first verify
it is working properly by plugging it into a power source and verifying it passes
its self test.
If you have installed a second power supply, repeat these procedures with the
second power supply to verify it works correctly also.
1.
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
Figure 2-5. Connecting power to the Switch
N o t e
The Switch 4200vl Series do not have a power switch. They are powered on
when the power cord is connected to the switch and to a power source.
If your installation requires a different power cord than the one supplied with
the switch, please see the “Installation Precautions” on
page 2-5
.
2.
Check the LEDs on the switch and on each of the switch modules. The
LED behavior is described on the next page.
If the LED display is different than what is described, especially if the
Fault LED stays on for more than approximately 120 seconds or it starts
flashing, the self test has not completed correctly. Refer to chapter 4,
“Troubleshooting” for diagnostic help.
connect power cord
to power connector
Содержание J8770A
Страница 1: ...Installation and Getting Started Guide www procurve com ProCurve Series 4200vl Switches ...
Страница 2: ......
Страница 3: ...ProCurve Switch 4200vl Series Installation and Getting Started Guide ...
Страница 78: ......
Страница 100: ...Copyright 2005 2007 Hewlett Packard Development Company L P September 2007 Manual Part Number 5991 8601 5991 8601 ...