Installation Manual
CA294-03070 rev 00
page 134 of 153
Proc.
Electrical cabinet M1
Notes
21.
At the unwinder
Close all doors and Covers and make sure that the Control on
button works correctly
22.
Check the
Unidrive
connections at
24F1- 29F1
Make sure that the Boards are inserted correctly
23.
Check the
Unidrive
connections at
24U0
Make sure that the Boards are inserted correctly
24.
Make sure that the
Unidrives
turn
on
Proc.
Electrical cabinet M2
Notes
Note:
For each of the following tests, the Connections are 3 x 400V + N + G.
The Neutral and Phase should also be checked against Ground.
25.
Turn the circuit breaker
20F8
on
Make sure that the Cabinet Fan works correctly
Make sure that the Power Supply (
20G8
) green LED is on
24V Power Supply
For all Electrical cabinets
26.
Turn the circuit breakers
20F8.1
on
Make sure that the PLC LEDs are lit
The I/O (60A0 – 60A2) LEDs do not light at this stage.
24V Power Supply
For both electrical cabinets
(Figure 44 and Figure 45)
27.
Turn the following circuit breakers on:
a.
20F3.1
b.
43F1
c.
22F7
28.
Check the
Unidrive
connections at
VB2- FX
Make sure that the Boards are inserted correctly
Turn the
Unidrives
on
29.
Turn the following circuit breakers on:
a.
11Q3
b.
11Q5
Inverter VB2
Inverter VBX
30.
Turn the following Unidrive circuit breakers on:
a.
24F1
b.
25F1
c.
26F1
d.
27F1
e.
28F1
f.
29F1
Controls:
Unidrive FP1
Unidrive IP1
Unidrive FP2
Unidrive IP2
Unidrive FE
Unidrive FX
31.
Turn the printing engines main power on.