Installation Manual
CA294-03070 rev 00
page 10 of 153
Heading
Step
Reference
Procedure
Notes and
check
Chiller and
chiller pipes
(60 mins)
28.
Installing the chiller
on page 72
Install chiller pipes adapters and
connections.
Install chiller according to specifications.
Refer to the UltraFilter ultracool 0400
installation guide:
Flow rate of 56 ±5 liters/minute
Temperature (measured at the press
inlet) of 6°C
Make sure that the external filter supplied
by the supplier is installed. The filter should
be installed at the chiller return pipe.
Connect the cooling water hoses to the
press as shown in Figure 53 and Figure 54
(depending on country of installation).
Hoses from chiller
should be prepared
UPS
(10 mins)
29.
Install and connect the UPS cables.
Cables to be found in cabinet M1.
Check the installation of all UPS cables
between the electrical cabinet M1, PE1,
and PE2.
Connect the cables to the internal battery.
Writing head
(30 mins)
30.
Install the writing
head on page 76
Remove writing head from box 8.
Remove under-plate at heater window.
Install and align writing head.
HVPS
(40 mins)
31.
Install HVPS units and covers.
Roof
(15 mins)
32.
Install roof covers.
Utility cabinet
top cover
(15 mins)
33.
install on page 117
Install utility cabinet top cover.
Various
components
(45 mins)
34.
Install system
components on page
80
Install the following in each engine:
PTE/air
knife.
Scorotron
units.
Cleaning station and wiper blade.
ITM
cover.
BID
units.
Thoroughly clean the BID units.
Ametek
filters.
3
rd
Day
Lift ILP,
unwinder,
utility
cabinets, ink
cabinets
(20 mins)
35.
Lift and move the ILP,
unwinder, utility
cabinets, and ink
cabinets on page 80
Lift the ILP, unwinder, utility cabinets, and
ink cabinets to the raised platform floor.
36.
Position ILP near PE1. Position ILP feed
and exit stepping plate assemblies near
ILP.
ILP
(120 mins)