50
Index
A C E F G H I L P R S T V
A
Accessing the IRF fabric to verify the configuration,
33
C
Chassis views,
39
Configuration terminal problems,
34
Configuring basic IRF settings,
32
Connecting the console cable,
21
Connecting the physical IRF ports,
33
Connecting the power cord,
19
Contacting HP,
36
Conventions,
37
E
Examining the installation site,
4
F
Fan failure,
34
G
Grounding the switch,
12
H
Hot swappable fan trays,
42
Hot swappable power supplies,
42
I
Installation tools,
5
Installing the switch in a 19-inch rack,
6
Installing/removing a fan tray,
14
Installing/removing a power supply,
16
IRF fabric setup flowchart,
28
L
LEDs,
46
P
Planning IRF fabric setup,
29
Ports,
44
Power supply failure,
34
Powering on the switch,
27
R
Related information,
36
S
Safety recommendations,
3
Setting terminal parameters,
24
Setting up the configuration environment,
21
T
Technical specifications,
40
V
Verifying the installation,
20