Server
operations
41
a.
Lift the PCI riser cage thumbscrews (1).
b.
Turn the thumbscrews counter-clockwise to loosen them (2).
c.
Lift the PCI riser cage from the server (3).
CAUTION: If a RILOE board is installed in the riser cage, the
cable to the system board must be removed after the riser cage is
partially lifted from the server.
Installing the PCI riser cage
CAUTION: To prevent damage to the server or expansion
boards, power down the server and remove all AC power cords before
removing or installing the PCI riser cage.
Содержание DL385 - ProLiant - G5
Страница 1: ...HP ProLiant DL385 Server User Guide March 2005 Second Edition Part Number 376536 002 ...
Страница 8: ......
Страница 31: ...Server component identification 31 Power converter module LED Status Amber Failed Off Operating normally ...
Страница 34: ......
Страница 44: ......
Страница 122: ......
Страница 135: ...Troubleshooting 135 ...
Страница 138: ...138 HP ProLiant DL385 Server User Guide ...
Страница 141: ...Troubleshooting 141 ...
Страница 144: ...144 HP ProLiant DL385 Server User Guide ...
Страница 147: ...Troubleshooting 147 ...
Страница 152: ......
Страница 160: ...160 HP ProLiant DL385 Server User Guide Japanese notice BSMI notice ...