ENWW
Chapter 5 Theory of operation 55
8-bin mailbox
When the 8-bin mailbox is turned on, the flipper and eject assemblies receive the initialization
command and start the rollers in an attempt to eject any paper in the path. Then the assemblies
check the sensors. If the sensors detect media, they signal an initial jam.
If no jam exists, initialization for the flipper and eject assemblies is complete. This triggers the
elevator initialization. The elevator initialization is the same for all of the operating modes, with
the exception of the end of the initialization. The final position of the elevator head depends on
the presence of paper and the operation mode.
Note
At initialization, make sure that the encoders in the flipper and belt motors are connected. If no
transitions are detected, a critical error is indicated. This test is performed only during initialization.
Содержание C8088B
Страница 1: ...service ...
Страница 2: ......
Страница 10: ...8 Contents ENWW ...
Страница 44: ...42 Installation ENWW ...
Страница 153: ...ENWW Chapter 6 Removal and replacement 151 Figure 118 Stacker controller PCA 2 2 2 2 1 3 2 3 ...
Страница 167: ...ENWW Chapter 6 Removal and replacement 165 4 Lift the right side of the top cover Figure 137 Top cover 3 of 3 ...
Страница 270: ...268 Parts and diagrams ENWW Figure 198 3 000 sheet stapler stacker 2 of 2 10 14 13 21 12 19 20 11 17 18 22 15 16 23 ...
Страница 272: ...270 Parts and diagrams ENWW 3 000 sheet stacker Figure 199 3 000 sheet stacker 1 of 2 5 10 4 3 2 1 9 8 6 7 11 ...
Страница 299: ......
Страница 300: ... 2004 Copyright Hewlett Packard Development Company L P Q5693 Q5693 90002 90002 Q5693 90002 ...