14
●
When measuring 3 phase 3 wires, connect the Meter as figure 7.
figure 7
Insert red test leads to
A
input terminal.
Insert blue test leads to
B
input terminal
Insert black test leads to
COM
input terminal and connect it to the
neutral wire of the 3 phase.
●
When measuring single phase 2 wires, connect the Meter as figure 8