Table 1-1. Site Preparation Technical Tasks.
Technical Tasks
Responsible Personnel
Line voltage measurement
Electrician and Customer Engineer (CE)
Line voltage measured
Electrician and Customer Engineer (CE)
Power line frequency measured (if required)
CE
Power line noise levels measured (if required)
CE
Neutral or ground noise/voltage levels measured
CE
Safety and ground connections verified
Electrician and CE
Advice on correct circuit breakers and wire size
Electrician and CE
Verification that maintenance power outlets
(those used for floor cleaning, etc.) are on sepa-
rate circuits from the computer system
Electrician and CE
Recommendations about lightning protection
CE
Measurements and recommendations on radiated
interference
CE
Answers to questions concerning modems and
modem options
Applications Engineer (AE)
Thermal load of HP equipment
CE
Thermal load of non-HP equipment
Customer and Equipment Vendor
Modifications to Existing Electrical Service
Electrician and Customer
Modifications to Existing Air Conditioning
A/C Contractor and Customer
Environmental Contaminants
CE and Environmental Engineer/Contractor
Placement of Equipment (For Service Access)
CE
Содержание 3000/9x9KS Series
Страница 10: ...x ...
Страница 38: ...A 4 Figure A 1 Space Planning Grid Sheet ...
Страница 39: ...A 5 Figure A 2 System Cutouts ...
Страница 70: ...B 28 ...
Страница 75: ...C 5 Figure C 3 Space Planning Grid ...
Страница 76: ...C 6 Figure C 4 K Class Equipment Profiles ...
Страница 77: ...C 7 Figure C 5 T Class Equipment Profiles ...
Страница 82: ...C 12 ...