background image

5. 

Commissioning

5.1  Water quality

26

4 210 255 / 02 

COMMISSIONING

Heating Water

The European Standard EN 14868 and the 

directive VDI 2035 must be observed.

In particular, attention must be paid to the following stipu-

lations:

• 

Hoval boilers and calorifi ers are designed for heating 

plants without signifi cant oxygen intake (plant type I ac-

cording to EN 14868).

•  Plants with

 - continuous oxygen intake (e.g. underfloor heating 

systems without diffusion proof plastic piping) or

 - intermittent oxygen intake (e.g. where frequent refill-

ing is necessary)

must be equipped with 

separate circuits.

• 

Treated fi lling and replacement water must be tested at 

least 1x yearly. According to the inhibitor manufacturer‘s 

instructions, more frequent testing may be necessary.

• 

A refi lling is not necessary if the quality of the heating 

water in existing installations (e.g. exchange of boiler) 

conforms to VDI 2035.

The Directive VDI 2035 applies equally to the replace-

ment water.

•  New and if applicable existing installations need to be 

adequately cleaned and fl ushed befor being fi lled. The 

boiler may only be fi lled after the heating system has 

been fl ushed!

• 

Parts of the boiler / calorifi er which have contact with 

water are made of ferrous materials and stainless steel.

•  On account of the danger of stress cracking corrosion 

in the stainless steel section of the boiler the chloride, 

nitrate and sulphate content of the heating water must 

not exceed 50 mg/l.

•  The pH value of the heating water should lie between 

8.3 and 9.5 after 6-12 weeks of heating operation.

Filling and replacement water

•  For a plant using Hoval boilers untreated drinking water 

is generally best suited as heating medium, i.e. as fi ll-

ing and replacement water. However, as not all drinking 

water is suitable for use as as fi lling and replacement 

water  the  water  quality  must  fulfi l  the  standard  set  in 

VDI 2035. Should the mains water available not be 

suited for use then it must be desalinated and/ or be 

treated with inhibitors. The stipulations of EN 14868 

must be observed.

• 

In order to maintain a high level of boiler effi ciency and 

to avoid overheating of the heating surfaces the values 

given in the table should not be exceeded (dependent 

on boiler performance ratings - for multi-boiler plants 

rating of smallest boiler applies - and on the water con-

tent of the plant).

• 

The total amount of fi lling and replacement water which 

is used throughout the total service life of the boiler 

must not exceed three times the water capacity of the 

plant.

Maximum filling capacity based on VDI 2035

Total hardness of the fi lling water up to ...

[mol/m

3

1

<0,1

0,5

1

1,5

2

2,5

3

>3,0

f°H

<1

5

10

15

20

25

30

>30

d°H

<0,56

2,8

5,6

8,4

11,2

14,0

16,8

>16,8

e°H

<0,71

3,6

7,1

10,7

14,2

17,8

21,3

>21,3

~mg/l

<10

50,0

100,0

150,0

200,0

250,0

300,0

>300

Conductance 

2

<20

100,0

200,0

300,0

400,0

500,0

600,0

>600

Boiler size of the 

individual boiler

maximum fi lling quantity without desalination

to 50 kW

NO REQUIREMENT

20 l/kW

Sum of alkaline earths

If the conductance in µS/cm exceeds the tabular value an analysis of the water is necessary.

Содержание UltraOil 16

Страница 1: ...nstallations may only be carried out by a qualified electrician The UltraOil heating boiler is suitable for and approved as a heating unit for hot water systems with permitted flow temperatures up to...

Страница 2: ...3 Dimensions UltraOil 16 35 18 3 4 Space requirement UltraOil 16 35 19 4 Installation 4 1 Boiler room requirements 20 4 2 Flue gas connection and chimney 20 4 2 1 Project planning instructions 20 4 2...

Страница 3: ...kage testing 33 6 4 Servicing the neutralisation installation if fitted 34 6 4 1 Procedure for servicing the neutralisation installation 34 6 5 Safety temperature limiter Reset 35 6 6 Resetting the fa...

Страница 4: ...irective TRD 721 Safety equipment to safeguard against ex cess pressures safety valves for group II steam boil ers DVGW TRGI Technical regulations for gas installa tions DVGW process sheet G600 VDI 20...

Страница 5: ...on taminated operating materials gas water combustion air unsuitable chemical additives to the heating water improper handling faulty installation unauthorised modi fications and damage due to the use...

Страница 6: ...agonal nuts Fig 01 Using a spirit level set the boiler in longitudinal and trans verse direction and position it with a slight forward tilt This is done by adjusting the nuts on the boiler feet After...

Страница 7: ...the stop turn it through 15 so that the projection hangs under the screw head Fig 06 Fig 05 Screw head Fig 06 6 Fix the burner in position by tightening the screw 3 Fig 03 Insulate the cavity between...

Страница 8: ...be connected to the boiler with the standard plug in connection The burner cable must be shortened so that the plug in connection has to be parted to swing out the burner 4 5 Cable outlet to the left...

Страница 9: ...densate discharge into lower drain line Drain optionally on the left or right side Fig 09 Possibility 2 see chapter 2 5 Execution with Neutralisation box For condensate discharge in lower drain line i...

Страница 10: ...condensate tray 4 and tighten securely connection must be sealed 4 Slide the siphon support 3a under the siphon 2 3 5 5a 4 3a Fig 14 5 Fit drain 5 on siphon 3 and lead it outwards op tionally left or...

Страница 11: ...owards the front 2 2a 3 Fig 16 3 Remove base plate 3 Fig 16 Lift base plate straight upwards and remove 4 5 Fit rear cover 4 fFig 17 of the neutralisation box 6 Fit jubilee clip 5 approx 20mm from the...

Страница 12: ...Fig 16 and front cover 2a 10 Fig 21 Before commissioning the neutralisation box must be filled with water in order to prevent flue gas leakage The condensate drain must be made of corrosion resistant...

Страница 13: ...isation granulate front 2 Fig 24 3 Remove front cover 2a Fig 25 Release lateral locking bolt 1 Fig 22 turn approx to the left and pull out as far as the stop Lift the front cover straight upwards and...

Страница 14: ...28 7 Fig 28 10 Slightly loosen the jubilee clip 8 Fig 29 and push it upwards Firmly tighten the jubilee clip connection must be sealed 8 Fig 29 11 Fill the neutralisation box with water 12 Fit the fro...

Страница 15: ...2 8 Fitting the flue gas silencer Option The silencer must be installed vertically The maximum permissible angle of inclination is 45 Fig 31 15 4 210 255 02 ASSEMBLY...

Страница 16: ...directives standards We hereby declare that the product described as an in dividual unit complies with the standards guidelines and technical specifications listed Directives 92 42 EG Efficiency direc...

Страница 17: ...or 3 5 3 5 3 5 3 4 Hydraulic resistance at 10 K mbar 6 6 10 6 16 6 30 6 Hydraulic resistance at 20 K mbar 1 7 2 6 4 2 7 7 Water flow rate at 10 K m3 h 1 38 1 74 2 18 3 00 Water flow rate at 20 K m3 h...

Страница 18: ...afety flow R1 2 Low temperature return R1 3 High temperature return R1 4 Flue gas outlet DN80 5 Boiler controller 6 Condensate drain left or right incl siphon DN25 and 2 m PVC continuous flow tube inn...

Страница 19: ...erviceposition vorne Kesselreini gung von rechts A optimum 300 mm Burner service position left boiler cleaning from the front A minimum gap of 160 mm is required to the right of the boiler without fit...

Страница 20: ...fitted an appropriate allowance must be added so that the free cross section area reaches the amount given above 4 2 Flue gas connection and chimney 4 2 1 Project planning instructions The flue gas m...

Страница 21: ...g must be observed Hoval UltraOil must only be operated with heating oil EL low sulphur with sulphur content 50 ppm 0 005 It is recommended that you clean the oil tank before refilling it A residual a...

Страница 22: ...ol box Danger of cuts and pinching in the area of the trim strip A Wear gloves Grip the switch control box by the left and right sides not by the un derside 1 Schalld mmhaube 1 Fig 23 abnehmen dazu se...

Страница 23: ...y it be possible to connect such equipment Fuse Boiler room emergency switch Heat generator Boiler room lighting and pwer sockets must be in a separate circuit Fig 39 3 The fresh air sensor must not b...

Страница 24: ...n flow 30 C 70 80 90 100 30 40 50 60 70 14 16 18 20 C kW 70 80 90 100 30 40 50 60 70 14 16 18 20 C kW UltraOil 25 Flow 80 C return flow 60 C Flow 40 C return flow 30 C 70 80 90 100 30 40 50 60 70 15 1...

Страница 25: ...ere fore unnecessary Regarding the discharge of condensate the local regulations and the ATV Sewage Engineering Association data sheet must be observed 4 8 Setting the temperature regulators Basic set...

Страница 26: ...The pH value of the heating water should lie between 8 3 and 9 5 after 6 12 weeks of heating operation Filling and replacement water For a plant using Hoval boilers untreated drinking water is general...

Страница 27: ...filled with water 5 5 Oil burner Setting the burner must also be carried out by a specialist and the setting must correspond to the heat demand of the system Please see the technical information asse...

Страница 28: ...it possible only with H Gen without minimum H Gen temperature e g condensing boiler Start PRESS HC level Parameters 13 16 H GEN level Parameter 4 Characteristic heating curve Enable HC Activate Instal...

Страница 29: ...6 17 18 19 20 21 22 23 24 25 26 t TAGE 55 45 35 25 Funktionsheizen und Belegreifheizen START 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 TAGE 55 45 35 25 3 Funktionsheizen und...

Страница 30: ...water tempera ture since the hot water temperature can exceed the temperature setpoint Emissions metering E SS O Immediate end PRESS SHORTLY Remaining time display REACTIONS for emissions metering Ti...

Страница 31: ...or remove siphon trap 7 Fig 43 siphon base section 8 fig 38 siphon support 8a or neutralisation box 9 Fig 44 Danger flue gas escaping through the si phon can endanger lives poisoning The siphon page...

Страница 32: ...1 2 3 4 5 Fig 42 10 9 6 10 8 6 7 Mount hose for wet cleaning Design with condensate discharge Design with neutralisation box if fitted Fig 43 Fig 44 8a 32 4 210 255 02 MAINTENANCE...

Страница 33: ...Hoval Art No 6022 844 Before removing the drain hose all dirt particles must be adequately rinsed out of the condensate drip tray Do not use wire brushes or any sharp objects for cleaning Ensure that...

Страница 34: ...in control switch to 0 Remove the front cover Undo the bolts and withdraw the neutralisation box Remove the neutralisation granules and any deposits from the neutralisation box Any remaining neutralis...

Страница 35: ...ure rises too high 100 C the system is switched off by the safety temperature limiter by means of a mechanical lockout Press the reset button on the control panel first remove the cover the boiler is...

Страница 36: ...rt build up on the heating surface Burner output setting too high Operation without jet inserts 6 6 2 Flue gas temperature limiter reset if no flue gas sensor is fitted If the flue gas temperature ris...

Страница 37: ...0 3 5 Heating curve MC2 1 0 OFF 0 20 3 5 Daytime target temperature HC 20 C 5 30 C Daytime target temperature MC1 20 C 5 30 C Daytime target temperature MC2 20 C 5 30 C Night time target temperature H...

Страница 38: ...2 Cycle 3 Cycle 1 Cycle 2 Cycle 3 from to from to from to from to from to from to from to from to from to Mo Tu We Th Fr Sa Su Mixer Circuit 1 Time program P1 Time program P2 Time program P3 Tag Cycl...

Страница 39: ...1 HF 4 Limit temperature for summer disconnection 22 C HF 5 System frost protection 3 C HF 6 Demand contact module for VE1 1 HF 7 Demand contact module for VE2 1 HF 8 Demand contact module for VE3 1...

Страница 40: ...me out OFF 30 min HF 20 PI reference value control OFF HF 21 PI amplification factor P portion Xp 0 1 K OEM 22 PI scanning time Ta 20 s OEM 23 PI reset time Tn 600 s C OEM UNMIXED CIRC Par Designation...

Страница 41: ...tion abatement heating circuit 0 8 K HF 15 Pump follow on 5 min HF 16 Screed function OFF HF 18 P portion Xp 2 0 K OEM 19 Scanning time Ta 20 s OEM 20 I portion Tn 270 s OEM 21 Running time servomotor...

Страница 42: ...tion abatement heating circuit 0 8 K HF 15 Pump follow on 5 min HF 16 Screed function OFF HF 18 P portion Xp 2 0 K OEM 19 Scanning time Ta 20 s OEM 20 I portion Tn 270 s OEM 21 Running time servomotor...

Страница 43: ...portion Xp 5 K OEM 20 Modulation scanning time Ta 20 s OEM 21 Modulation adjustment time Tn 180 s C OEM 22 Modulation running time 12 s HF 23 Modulation starting time 200 s HF 24 Modulation start up...

Страница 44: ...on 2 HF 7 Heat generator cycle lock only when parameter 06 1 3 4 0 5 h HF 8 Solar priority parallel changeover 10 K HF 9 Solar heat balance OFF HF SOLAR RESET Reset heat balance HF 11 Volumetric flow...

Страница 45: ...Par Designation Factory 10 20 30 40 50 Lev 1 Bus address central device 10 HF 2 Bus right RS direct circuit 1 HF 3 Bus right RS mixer circuit 1 1 HF 4 Bus right RS mixer circuit 2 1 HF BUFFER Par Des...

Страница 46: ...MAINTENANCE ST 1 for X days 7 HF 12 Maintenance according to fixed date OFF HF 13 Maintenance according to fixed interval OFF HF 14 Maintenance according to maintenance counter OFF HF 15 Reset mainte...

Страница 47: ...on KVLF 19 0 System Collector sensor Short circuit KVLF 19 1 System Room sensor RS Interruption 20 0 System Room sensor RS Short circuit 20 1 System Burner 1 No switching off 1 min 30 2 With par log a...

Страница 48: ...tpoint 85 4 System HP return sensor Return max temp exceeded 85 5 System QF Heat source min temp below setpoint 86 4 System QF Heat source max temp exceeded cooling operation 86 5 System QF Fault heat...

Страница 49: ...49 4 210 255 02...

Страница 50: ...ype Serial number Year of manufacture Place Date System installer System user Confirmation The user owner of the system herewith con rms that he has received adequate instruction in the operating and...

Отзывы: