7. Slide the neutralisation box (6, Fig. 27) into the boiler
until the hose of the siphon (5a, Fig. 26) is directly
beneath the drain connection.
6
Fig. 27
8.
9. The hose of the siphon (5a, Fig. 26) can be easily
pushed onto the drain connection of the condensate
drip tray by lifting the neutralisation box (7, fig. 28).
7
Fig. 28
10. Slightly loosen the jubilee clip (8, Fig. 29) and push
it upwards. Firmly tighten the jubilee clip (connection
must be sealed).
8
Fig. 29
11. Fill the neutralisation box with water.
12. Fit the front cover (9, Fig. 30) of the neutralisation
box.
13. Fit base plate (3, Fig. 25) and front cover (2a).
9
Fig. 30
Before commissioning the neutralisation box
must be filled with water in order to prevent
flue gas leakage.
The condensate drain must be made
of corrosion-resistant material.
14
4 210 255 / 02
ASSEMBLY
Содержание UltraOil 16
Страница 49: ...49 4 210 255 02...