Dimensions BioLyt (110,130 &160)
Measurements and space requirements for maintenance
(all measurements in mm)
1a
Boiler flow connection
DN 50
1b
System flow connection
DN 50
2a
Boiler return connection
DN 50
2b
System return connection
DN 50
3
Pellet feed system / transfer box / RAS 51
4
Safety heat exchanger connections 2 x R ½"
5
Drain
R 1"
6
Flue gas outlet
External Ø 180 mm
7
Induced draught fan
8
Control panel (can be fitted right or left side)
9
Sight glass
10
Pocket for boiler sensor
Rp ¾"
(behind the casing)
11
Pocket for sensor of the thermal
flow safeguard (behind the casing) Rp ½"
12
Low return temperature protection kit
1
minimum distance to wall on the control side 700 mm,
on the opposite side 150 mm.
Note: The RAS 41 pellet transportation system is not
suitable for the BioLyt (110 - 160).
4
Hoval BioLyt (50-160)