2.4
Fitting the condensate drain (standard
design)
1.
Remove front cover (1a, Fig. 13). Release lateral lo
-
cking bolt (1) (turn approx. ¼ turn to the left and pull
out as far as the stop). Lift the front cover straight
upwards and remove towards the front.
1
1a
Fig. 13
2.
Remove base plate (2, Fig. 14). Lift the base plate
straight upwards and remove it.
3.
Screw siphon (3) on the condensate tray (4) and tigh
-
ten securely (connection must be sealed)
4.
Slide the siphon support (3a) under
the siphon.
2
3
5
5a
4
3a
Fig. 14
5.
Fit drain (5) on siphon (3) and lead it outwards (optio
-
nally left or right side) through the aperture (5a).
6.
Fit connecting line (5) to the drain line (2m hose enc
-
losed with the boiler).
7.
Reattach front cover (1a, Fig. 13) and base plate (2,
Before commissioning the siphon must
be filled with water in order to prevent flue
gas leakage.
The condensate drain must be made of
corrosion-resistant material.
9
4 213 784 / 00
ASSEMBLY
Содержание 41-UltraOil 16
Страница 35: ...35 4 213 784 00...