background image

29

Limited Warranty

Warm Air Furnace

The operation of this heater in a manner inconsistent with the owner’s manual will void your warranty and is also against federal regulations.

United States Stove Company warrants to the original purchaser its heating products against premature failure of any component due to workmanship, 

quality, or materials as follows: 

TIME PERIOD:

Firebox ...................................................................................................................................... Three Years

Flue Collar - if equipped .............................................................................................................. Three Years

All Doors (Feed and Ash)............................................................................................................. Three Years

Cabinet and Trim ........................................................................................................................ Three Years

Bi-Metal Thermostat ......................................................................................................................Two Years

Cast Iron Components, Steel Liners and Retainers ............................................................................ One Year

Gaskets ......................................................................................................................................... One Year

All Electrical Components (Including Blower) - if equipped ................................................................. One Year

Paint and Finish .............................................................................................................................. One Year

CLAIM PROCEDURE

Any defects should be reported to United States Stove Company or its dealer and/or distributor giving descriptions and pertinent data, including proof or 

purchase which will be returned upon request.

Providing the heater has been installed and used in accordance with the Owners Manual supplied with the heater, United States Stove Company will either:

1)  Replace the defective part free of charge

2)  Replace the heater free of charge

3)  Where the defect is of a cosmetic (non-functional) nature, United States Stove Company will bear reasonable expense to refurbish the heater, 

including such items as welding, painting, and incidental labor. A “Reasonable” expense is defi ned by terms of this warranty as $30.00/hour with full 

refund for any purchase of parts.

NOT COVERED

Specifi cally not covered under terms of this limited warranty or any other warranty are problems relating to smoking or creosote.  Smoking is attributable 

to inadequate draft due to the design or installation of the fl ue system or installation of the heater itself.  Creosote formation is largely attributable to 

improper operation of the unit and/or draft as mentioned above.  Also, not covered are:

1)  Removal and re-installation cost.

2)  Service calls to diagnose trouble (unless authorized in writing by the manufacturer, distributor, or dealer).

3)  Painted surfaces, brass or brass-colored surfaces.

4)  Damage or defect caused by improper installation, accidents, misuse, abuse (including overfi ring) or alteration.

5)  Transportation or shipping costs.

LIMITATIONS AND EXCLUSIONS

1)  United States Stove Company shall not be liable for incidental, consequential, special, or contingent damages anyone might suffer as a result of their 

breach of this written warranty or any implied warranty.

2)  Should the heater be replaced by United States Stove Company “free of charge”, all further warranty obligations are thereby met.

3)  Parts and/or service replacements made under the terms of this warranty are warranted only for the remaining period of the original heater warranty.

4)  Without specifi c written exclusionary waivers, no one has authority to add to or vary this limited warranty, or to create for United States Stove 

Company any further obligation of liability in connection with this heater or any other applicable accessory.  Any further warranty implication applicable 

to this heater or any applicable accessory is limited in duration to the same time period as the original statement in the above schedule.

YOUR DUTIES

1)  This heater, including all applicable accessories, must be installed and operated in accordance with local authorities having jurisdiction and the 

instructions furnished with the Owners Manual.

2)  You should keep as permanent record your proof of purchase (or canceled check or invoice).

PROBLEM/RESOLUTION

1)  As purchaser, you must fi rst contact the dealer and/or distributor from whom you purchased your heater.

2)  If within a reasonable period of time you do not receive satisfactory service from the distributor and/or dealer, write or call United States Stove 

Company, Customer Service Department, including complete details of the problem and/or problems you are experiencing, details of your installation, 

your proof of purchase, and the heater serial number or test agency code number.

WARRANTOR

The warrantor of record is United States Stove Company, PO Box 151, 227 Industrial Park Road, South Pittsburg, Tennessee 37380.  

Phone number 800-750-2723 • Website www.usstove.com

NOTE

This warranty gives you specifi c legal rights; and, you may also have other rights which vary from state to state.

IMPORTANT

Keep this warranty card for future reference.

85815I

Содержание 1357M

Страница 1: ... FORCED AIR GAS OR OIL FIRED FURNACE U S ONLY FOR INSTALLATION AS A CENTRAL FURNACE ALL MODELS CERTIFIED UNDER UL 391 85591V 0602G CAUTION READALLINSTRUCTIONSCARE FULLY BEFORE STARTING THE INSTALLATIONOROPERATING THE FURNACE IMPROPER INSTALLATION MAY VOID YOUR WARRANTY DO NOT USE THIS FURNACE IN A MOBILE HOME OR TRAILER U S Environmental Protection Agency Certified to comply with 2015 particulate ...

Страница 2: ...er or 5 16 Socket W Ratchet Safety Glasses MATERIAL 6 Pipe 6 Elbow Collar and Thimble as required 24 gauge min 1 2 Sheet Metal Screws 6 Inside diameter Listed Residential Type or Building Heating Appliance Chimney or existing masonry chimney Electrical Wiring 6 Draft Regulator 1 2 Conduit Conduit Connectors Furnace Cement Manufacturer Recommends Rutland Black Code 78 or Equivalent Plenum and Duct ...

Страница 3: ...AFETY NOTICE If this heater is not properly installed a house fire may result For your safety follow the installation directions Contact local building or fire of ficials about restrictions and installation inspection requirements in your area If not already installed we recommend that smoke detectors be installed CAUTION CLEANOUT OF THE HEAT EXCHANGER FLUE PIPE CHIMNEY AND DRAFTINDUCER IFUSED ISE...

Страница 4: ...A 211 The address of the NFPA is Batterymarch Park Quincy MA 02269 11 Keep the ashpit section free of excess ashes Do not al low ashes to stack higher than the sides of the ash pan 12 DISPOSAL OFASHES Place ashes in a metal container with a tight fitting lid Keep the closed container on a noncombustible floor or on the ground well away from all combustible materials Keep the ashes in the closed co...

Страница 5: ...TRAL FURNACE INSTALLATION As a central furnace the unit functions independently of any other system The blower will come on when the plenum temperature reaches the setting on the blower control PARALLEL INSTALLATION U S ONLY The design is such that when the blower comes on the blower on the central system also comes on The blower will only come on when the temperature in the plenum has reached the...

Страница 6: ...6 Figure 2 Model 1557M Figure 1 Model 1357M DIMENSIONS OF FURNACE ...

Страница 7: ...ble surfaces If you have a solid brick or stone wall behind your furnace you can place the furnace as close as you wish to the wall If the wall is only faced with brick or stone treat it as a combustible wall 18 18 6 SOLID DAMPER 6 BAROMETRIC DRAFT REGULATOR NON COMBUSTIBLE FLOOR 12 9 48 18 CENTRAL FURNACE 6 CHIMNEY 21 Figure 4 Figure 5 1357M 1557M Unit to Sidewall 12 305mm 12 305mm Unit to Backwa...

Страница 8: ...manufacturer s instructions Use only a Listed Residential Type or Building Heating Appliance Chimney If your chimney starts at the ceiling Fig 7 you will need enough 6 pipe to reach the ceiling The top of the chimney must be at least 3 feet above the roof and be at least 2 feet higher than any point of the roof within 10 feet Fig 7 IMPORTANCE OF PROPER DRAFT Draft is the force which moves air from...

Страница 9: ... same room same pressure zone as the furnace 8 Install the barometric draft regulator strictly in accordance with the instructions that are provided with the barometric draft regulator 9 A solid damper must be used in the chimney connecting pipes be tween the flue collar and the chimney When used in conjunction with a barometric draft regulator the solid damper must be placed between the barometri...

Страница 10: ...ow to connect the chimney connector of a heater to a masonry chimney through a combustible wall There are five allowable ways that a chimney connector can be connected to a masonry chimney by passing through a combustible wall NFPA Standard 211 allows the following wall pass through systems Figure 11 ...

Страница 11: ...ATTACH CONNECTOR SECURELY AIR SPACE inner surface of the chimney flue and shall be firmly cemented in place See Part A 2 Use a solid insulated listed factory built chimney length having an inside diameter of 6 and having 1 or more of solid insulation There must be at least a 9 air space between the outer wall of the chimney length and any combustible materials The inner end of the chimney length s...

Страница 12: ... thermal conductivity of 1 0 Btu in ft F 4 88 kg cal hr m C or less 2 All clearances and thicknesses are minimums larger clear ances and thickness are acceptable 3 A chimney thimble as shown for 3 and 4 above Parts C and D shall be for types 3 and 4 connections to facili tate removal of the chimney connector for cleaning The chimney thimble shall be of ASTM C315 fireclay with 5 8 minimum wall thic...

Страница 13: ...uired to lock feed door during firing sequence 4 Install the thermodisc on rear of furnace cabinet with the two screws provided Mount the conduit assembly from the junction box to the thermostat bracket Crimp the two female terminals to each of the wire leads Plug the wires to the thermodisc NOTE It does not matter which of the two wires plugs to which terminal on the thermodisc 5 Remove blowers f...

Страница 14: ... wiring wires M1 M2 of one blower motor Wire leads from the distribution blower are usually BOTH BLACK Makes no difference which leads from the motor s connects to the corresponding leads coming out of the conduit Figure 16 WIRING DIAGRAM ...

Страница 15: ...specificmodel Sealthesmokepipeinthechimneywithfurnacecement The chimney connector shall be securely supported and joints fastened with sheet metal screws or rivets e Install 8 diameter heat pipe to plenum of the central hot air furnace Use 26 gauge pipe and connectors to be purchased separately If central air conditioning is installed in the plenum install heat pipe above the air conditioning unit...

Страница 16: ...this purpose and install the new gasket You may light up your stove again approximately24hoursafterhavingcompletedthisoperation This unit s ash door uses a 5 8 diameter rope gasket This unit s feed door uses a 1 2 diameter rope gasket SERVICE HINTS Do not expect a furnace to draw It is the chimney that creates the draft Smoke spillage into the house or excessive build up of water or creosote in th...

Страница 17: ...el B Check length of flue pipe to chimney Your unit should be within six 6 feet of your chimney C Make sure chimney cap is not too close to the top of the chimney D Check chimney draft make sure chimney flue pipe is clean and chimney is of adequate height E Slide baffle should be pulled out prior to load door opening 4 Problem Distribution blower vibrating Solution A Tighten blower wheel to motor ...

Страница 18: ...18 Repair Parts 22 6 8 7 9 20 18 19 17 16 14 10 15 11 12 13 21 1 5 2 3 4 1 28 27 26 29 30 31 24 25 32 33 23 35 34 38 37 36 40 38 36 37 39 34 42 41 46 48 47 44 43 45 49 1357M 1557M 69399 ...

Страница 19: ...wer 1357M 1 1557M 2 27 89319 Gasket Blower 1357M 1 1557M 2 28 83340 1 4 20 Clipnut 1357M 4 1557M 8 N S 83339 Bolt 1 4 20 x 3 4 1357M 4 1557M 8 29 22140 Relay Box Bracket 1 30 80131 Junction Box 4 x 4 1 31 80231 Junction Box Cover 1 32 80314 Thermodisc 60T12 1 33 68234 Blower Thermostat Bracket 1 34 89066 Firebrick 4 5 x 9 x 1 25 1357M 10 1557M 12 35 40264 Liner Front Rear 1357M 2 36 40256 Grate Fr...

Страница 20: ...uses a standard 16 x 20 x 1 filter NOT INCLUDED to reduce the amount of dust particles from being transfered thru you duct work system DR 6 BAROMETRIC DAMPER REGU LATOR In the unlikely event that your furnace overfires a con dition evidenced by elbows stove pipes and connectors glowing red in appearance or otherwise discoloring then your installation is subject to excessive draft cre ated by eithe...

Страница 21: ...himney s or installations are going to be the same Just remember to allow enough air to enter the firebox and keep the stove pipe damper open so that volatiles are properly burned Before refueling take the time to break up the cone a little with a poker especially if it has caked over or formed a crust But be careful not to mix the coal as this increases the chances of forming clinkers When shakin...

Страница 22: ...efueling If possible avoid shaking as a heavier layer of ash will help reduce the intensity of the fire during this time After loading let the fire establish itself for about 30 minutes Then close your damper and automatic control to the point where the house does not become too cold It is important that you begin banking early enough before retiring or leav ing that you can make necessary adjustm...

Страница 23: ...23 CENTRAL INSTALLATION CENTRAL INSTALLATION ADD ON INSTALLATION ...

Страница 24: ...AIR RETURN TOEXISTING DUCTWORK WARMAIR EXISTING FURNACE SOLIDFUEL FURNACE FILTERBOX PLENUM COLLECTOR BOX COLDAIR RETURN TOEXISTING DUCTWORK WARMAIR EXISTING FURNACE SOLIDFUEL FURNACE FILTERBOX COLDAIR RETURN PLENUMTOP OPTIONAL Appendix INSTALLATION A INSTALLATION B INSTALLATION C ...

Страница 25: ...25 INSTALLATION D INSTALLATION E ...

Страница 26: ...26 INSTALLATION F INSTALLATION G ...

Страница 27: ...27 INSTALLATION H TOP VIEW FRONT VIEW ...

Страница 28: ...ompany ________________________________________ Telephone No ______________________________________ Stove Inspected Chimney Swept Items Replaced ____________________________________ Service 05 Date ________________________ Engineer Name _____________________________________ Company __________________________________________ Telephone No ______________________________________ Stove Inspected Chimne...

Страница 29: ... 4 Damage or defect caused by improper installation accidents misuse abuse including overfiring or alteration 5 Transportation or shipping costs LIMITATIONS AND EXCLUSIONS 1 United States Stove Company shall not be liable for incidental consequential special or contingent damages anyone might suffer as a result of their breach of this written warranty or any implied warranty 2 Should the heater be ...

Страница 30: ...30 NOTES ...

Страница 31: ...31 NOTES ...

Страница 32: ...CHED TO THE HEATER WHEN ORDERING REPAIR PARTS ALWAYS GIVE THE FOLLOWING INFORMA TION AS SHOWN IN THIS LIST 1 THE PART NUMBER__________________________________ 2 THE PART DESCRIPTION______________________________ 3 THE MODEL NUMBER________________________________ 4 THE SERIAL NUMBER________________________________ United States Stove Company 227 Industrial Park Road P O Box 151 South Pittsburg TN 3...

Отзывы: