background image

19 

DN08.05.20Rev 00                                     www.hosseven.com.tr 
 

• If the gas inlet pressure is less than 20 mbar, it should be brought to 20 mbar. 

To increase the gas inlet pressure, regulator in the gas line should be used. Pressure 
increase and decrease cannot be made on the radiant device. 

•  If  the  gas  outlet  pressure  (injector  pressure)  is  different  from  the  value 

indicated in the table, we can increase or decrease the gas outlet pressure from the 
regulating regulator. 

 

5.1.

 

Operation of the Device 

 

1. Make sure that gas and electrical connections comply with the rules specified 

in the manufacturer's user manual. 

2. Open the gas through the gas valve. 
3. Make sure that the gas pressure is set correctly. 
4. Turn on the heater electrical connection. 
5. Press the on / off button on the remote control once. (you can also operate 

the device with the green button next to the device) 

6. The device will continue to burn in Stage 1 after burning has occurred. You 

can get the desired level from the remote by pressing (+ and -) keys. 

7. To switch off the device, you can switch the device off by pressing the on / off 

button. 

8. If the device did not work, switch off the device. 
9. Wait about 5 seconds before turning it back on. If the burner does not light 

after firing the intermittent spark plug 3 times, find the cause from the fault finding 
table given in the manual. If you can not solve, call the company service. 

 

5.2.

 

Device Shutdown 

 1. If you are temporarily closing, just turn it OFF with the REMOTE CONTROL 
 2. If you are closing permanently, turn off the electricity and gas valve. 

 

 

Содержание HRG-12

Страница 1: ...0 DN08 05 20Rev 00 www hosseven com tr HRK15 s USER MANUAL HRK 7 HRK 11 HRK 18 HRG 7 HRG 12...

Страница 2: ...1 DN08 05 20Rev 00 www hosseven com tr INFA RED HEATING DEVICES and USER MANUAL MODELS HRK 7 HRK 11 HRK 18 HRG 7 HRG 12 1839 HRK Model HRG Model...

Страница 3: ...6 2 1 Product Introduction 6 2 2 Product Technical Information 7 3 INFORMATION REQUIRED FOR INSTALLATION 9 3 1 Mounting Distances 10 4 INSTALLATION INSTRUCTIONS 12 4 1 Device Installation Instructions...

Страница 4: ...er installation operation or maintenance can lead to injury death or damage to your property This device must be installed according to mandatory standards and rules in the country of use Before insta...

Страница 5: ...warnings may result in injury to people and damage to the place where the device is mounted The rules stated in the manual should not be exceeded during assembly operation and maintenance This device...

Страница 6: ...not be damaged and cause an accident Radiant heater cannot be used by mounting on caravans and or boats Maintenance and repair should be done by an authorized person ONLY Improper assembly adjustment...

Страница 7: ...y Only allow it to be repaired by authorized person Some smoke may come out of the appliance during the first start up This smoke and steam consists of oils and paint used during the manufacture of th...

Страница 8: ...e 4 6 10 4 6 Power kW 7 11 18 7 11 2 Gas type and pressure G20 20 mbar LPG 30 mbar Gas Consumption m3 h NG 0 73 1 14 1 83 0 73 1 14 kg h LPG 0 55 0 84 1 37 0 55 0 84 Weight kg 12 7 15 6 18 3 14 5 17 2...

Страница 9: ...8 DN08 05 20Rev 00 www hosseven com tr Models HRG 7 HRG 12 A mm 657 839...

Страница 10: ...nditions The device can be found in conditions that can operate up to a maximum speed of 15km h Performance and flame vitality negatively affect the effect of higher speed wind In the case of water an...

Страница 11: ...the device will be mounted the device should be mounted in accordance with the dimensions and rules specified below During ignition it may damage the surrounding gas cylinder or gas line It should no...

Страница 12: ...11 DN08 05 20Rev 00 www hosseven com tr Distances to flammable materials Model A mm B mm C mm HRK 7 300 1100 2500 HRK 11 350 1100 2500 HRK 18 450 1200 3000 HRG 7 300 1100 2500 HRG 12 350 1100 2500...

Страница 13: ...imum room volume 4 INSTALLATION INSTRUCTIONS The rules for the installation rules of this device manual and the signs of gas assembly standards are installed in accordance with the rules Checks the ga...

Страница 14: ...13 DN08 05 20Rev 00 www hosseven com tr 4 1 Device Installation Instructions...

Страница 15: ...works are for authorized persons Devices are manufactured to operate at G20 20 mbar gas inlet pressure 20 mbar inlet pressure should remain constant while the devices are in the working environment Fo...

Страница 16: ...used to keep it constant Shut off valve should be installed so that the gas pressure does not exceed 35 mbar in the gas line 4 3 Electrical connection system The electrical connection must be connecte...

Страница 17: ...hatt hatta gaz verildikten sonra kontrol edilmelidir Make sure that the gas valve on the heater is closed Spray the foam made with a mixture of detergent and water or apply it to the joints with a br...

Страница 18: ...N OF THE DEVICE THE HEATER SHOULD BE OPERATED AFTER THE GAS LEAK CHECK INSTALLATION OR NOT DIFFERENT TO THE INSTRUCTIONS MAY CAUSE INJURY AND DAMAGE THE STRUCTURE READ THE INSTALLATION AND OPERATION I...

Страница 19: ...d pressure C Replacing the regulator cover D After adjusting to the appropriate pressure replace and tighten the regulator cover The gas inlet and outlet direction of the Siemens gas valve are shown i...

Страница 20: ...correctly 4 Turn on the heater electrical connection 5 Press the on off button on the remote control once you can also operate the device with the green button next to the device 6 The device will co...

Страница 21: ...that the customer user has learned to operate and give the operating instructions to the operating instructions 6 MAINTENANCE and SERVICE Regular maintenance is important for efficient operation of t...

Страница 22: ...o not direct the air to the sealing material between the ceramic and the combustion chamber 4 Cleaning the manifold and injector Disconnect the gas connection hose from the gas valve Heater must be cl...

Страница 23: ...ep the control box burner and air passages more frequent Originals of spare parts can be obtained from Ho seven A 7 OPTIMUM INSTALLATION DISTANCES Models A mm B mm HRK 7 1100 1500 3500 HRK 11 1800 150...

Страница 24: ...23 DN08 05 20Rev 00 www hosseven com tr Model B mm HRK 7 5000 5500 HRK 11 5000 6000 HRK 18 8000 8500 HRG 7 5000 5500 HRG 12 5000 6000...

Страница 25: ...cheme gas connections or other parts of the heater As Siemens gas valve unit is suitable for non volatile gases our heater also has the necessary limits for volatile gases It is possible to start agai...

Страница 26: ...Check and adjust the gas pressure Burner venturi check injectors determine if it is clogged 2 High speed wind prevents burning 3 Remove the wiring harness clean it provide ground 4 Check that the spa...

Страница 27: ...is excessive air flow from the bottom of the device 1 Check the ceramic installation 2 Change the ceramic 3 Change the heater mounting angle 4 Block the air flow at the bottom of the device Control bo...

Страница 28: ...the good the discount of the defect in the rate of replacement or if possible the replacement of the good with the same shame Hosseven evaluates this request If appropriate it meets the demand of the...

Отзывы: