R8E V2 Superchiller Remote
230V / 50Hz
lancerbeverage.com
Page 13 of 27
Hoshizaki Lancer reserve the right to change specifications without notice.
Part No: 68000009
Images are for illustration purposes only as product may vary.
No 027 – 7 March 2013
7. Scheduled
Maintenance
The following Superchiller routine maintenance should be performed at the intervals listed.
Daily
Cleaning/Sanitising
The Superchiller supplies soda water to the dispensing valves/barguns. To ensure optimum drink quality and
system performance at all times please follow cleaning and sanitising procedures for the dispensing
valves/barguns recommended by the valve/bargun manufacturer.
Checking CO
2
Supply
Ensure that the contents gauge on the CO
2
Regulator reads higher than 1400kpa on the dial. If it does not,
then the CO
2
cylinder is empty and must be changed using safe working practices.
Warning
To avoid personal injury and/or property damage, always secure
the CO
2
cylinder with a safety chain to prevent it from falling over;
and use appropriate protective equipment (as defined in Clause
3.3.2 of AS 5034) to handle cylinders.
Should the valve become accidentally damaged or broken off, a
CO
2
cylinder can cause serious personnel injury.
Quarterly
The Superchiller should be connected to a filtered water supply. To ensure optimum drink quality and
system performance, supply water filters should be replaced every 3 months.
Half Yearly
Check that the water is level with the top of the overflow tube. Add water if necessary.
Open carbonator relief valve to purge CO
2
and check leakage, close relief valve after checking.
Yearly
Water bath and recirculation pump inspection.
Isolate Superchiller from power supply by switching off at socket.
Thaw the bank of ice formed in the tank. Empty the water from the tank with a suction pump or
drainage pipe.
Inspect coils and agitator in water bath for algae or slime accumulation. Clean as necessary using a
soft brush, rinse with clean water.
Check recirculation pump strainers for accumulation, replace if necessary.
Fill tank with clean water until water flows out the overflow tube.
Switch on power supply and check ball position in flow indicator section of strainer. If ball indicates
flow is less than 5 litres per minute, replace pump.
Commission and purge system as per clause 6.11 and 6.12.