background image

lancerbeverage.com 

230V / 50Hz

 

Installation, Operation & 

Service Manual 

R8E V2 
Superchiller Remote 

Содержание Lancer Superchiller Remote R8E V2 Series

Страница 1: ...lancerbeverage com 230V 50Hz Installation Operation Service Manual R8E V2 Superchiller Remote...

Страница 2: ...cerbeverage com Page 2 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000009 Images are for illustration purposes only as product may vary No 027 7 March 20...

Страница 3: ...Superchiller 9 6 5 Connecting Superchiller to Remote Condensing Unit 9 6 6 Electrical Connection 9 6 7 Connecting Python 10 6 8 Plumbing the drain and CO2 exhaust 10 6 9 Connecting to water supply 11...

Страница 4: ...ice equipment Hoshizaki Lancer s head office and manufacturing base is located in Adelaide SA with branch offices and warehousing facilities in Sydney NSW Melbourne VIC Brisbane QLD Perth WA and Auckl...

Страница 5: ...Empty 123 kg 145kg Operating 305 kg 327kg Ice bank Weight 75 kg Water Bath Capacity 180 litres Construction Stainless Steel Agitator Motor 25W 230 VAC 1 Phase Ice bank Control Electronic Carbonation L...

Страница 6: ...e machine 5 2 Recognise Safety Alert Symbols The safety alert symbol precedes Warning and Caution notes throughout this manual To prevent personal injury or damage to the machine these alerts must be...

Страница 7: ...pressure De pressurise before performing any work on the system Warning ALL WIRING AND PLUMBING MUST CONFORM TO LOCAL AND NATIONAL CODES Warning SUPERCHILLER MUST BE ISOLATED FROM ELECTRICAL SUPPLY BE...

Страница 8: ...s is recommended to protect hands from potential injury from sharp edges The Superchiller must always be handled in a vertical position Carefully unpack the Lancer R8E Superchiller from the shipping c...

Страница 9: ...hould be sized correctly to provide a minimum return vapour velocity of 7 5m s vertical risers and 3 5m s horizontal sections Suction line pressure drop should comply with industry standard guidelines...

Страница 10: ...hould be connected to Chiller as follows 5 Pump 3 Pump SODA RETURN A WATER RETURN SODA RETURN B SODA RETURN A WATER RETURN SODA SUPPLY A WATER SUPPLY SODA SUPPLY B SODA SUPPLY A WATER SUPPLY Important...

Страница 11: ...d be within 7 C to 32 C 6 10 Connecting to CO2 supply Warning As carbon dioxide CO2 displaces oxygen prevention of CO2 leaks is paramount If a leak is suspected immediately ventilate the contaminated...

Страница 12: ...rom BIB containers Immerse all disconnects in warm water and clean using a nylon bristle brush Rinse with clean water Prepare sanitising solution according to manufacturer s instructions Attach saniti...

Страница 13: ...ed in Clause 3 3 2 of AS 5034 to handle cylinders Should the valve become accidentally damaged or broken off a CO2 cylinder can cause serious personnel injury Quarterly The Superchiller should be conn...

Страница 14: ...rs Immerse all disconnects in warm water and clean using a nylon bristle brush Rinse with clean water Prepare sanitising solution according to manufacturer s instructions Attach sanitising fittings to...

Страница 15: ...Page 15 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000009 Images are for illustration purposes only as product may vary No 027 7 March 2013 8 Postmix Ci...

Страница 16: ...16 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000009 Images are for illustration purposes only as product may vary No 027 7 March 2013 8 2 Twin Carbona...

Страница 17: ...lancerbeverage com Page 17 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000009 Images are for illustration purposes only as product may vary No 027 7 Mar...

Страница 18: ...set CO2 to 550 kpa Check carbonator control using procedure on page 25 Replace control or probe if defective If strainer and filter are clear and line valves are fully open noisy pump operation indica...

Страница 19: ...m of 172 kpa water supply pressure is required Check function setting of CO2 regulator Faucet delivers CO2 gas continuously Carbonator pump will not run due to power failure or low voltage Pump water...

Страница 20: ...s present on terminals N A ON 1 ON 2 terminals Work should only be performed by fully trained certified Electrical Plumbing Refrigeration Technicians 1 Remove the ice bank probe connections from termi...

Страница 21: ...230VAC is present on terminals N A ON 1 ON 2 Work should only be performed by fully trained certified Electrical Plumbing Refrigeration Technicians 1 Remove the carbonator probe connections from termi...

Страница 22: ...83 BACKFLOW PREV WATTS 9DB AUS 5 08000002 CARBONATOR RELIEF VAVLE 6 23822336 LANCER CARBONATOR ASSY 7 63000163 COIL ASSY PRECHILL B 8 79000332 CHECK VALVE S S 10MM BARB 9 79000739 BALL VALVE S S WATER...

Страница 23: ...lancerbeverage com Page 23 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000009 Images are for illustration purposes only as product may vary No 027 7 Marc...

Страница 24: ...V2 2 79000556 CLAMP B TUBE R8E 3 79000555 CLAMP A TUBE R8E 4 61616653 ICE PROBE BRACKET ASSY R8 5 16522334 ICE BANK PROBE 6 61000544 CONDUIT CABLE R8E V2 7 83000114 TX VALVE DANFOSS TUBE 03 8 8300027...

Страница 25: ...cerbeverage com Page 25 of 27 Hoshizaki Lancer reserve the right to change specifications without notice Part No 68000009 Images are for illustration purposes only as product may vary No 027 7 March 2...

Страница 26: ...abour Lancer will not normally cover any labour costs associated with a warranty claim Subject to the approval of the Divisional Sales Manager Lancer may choose to reimburse the customer for some or a...

Страница 27: ...ightness and correct wiring of harness Carbonator and plumbing pressure tested Check for leaks on pumps clamps welds strainers carbonator fittings and all joints Check check valve and strainer indicat...

Отзывы: