47
WARNING
Always protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze with the valve body exceeding 274°F.
8) Install the new Drier (see “4. DRIER”).
9) Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
10) Evacuate the system and charge it with refrigerant (see “1. [c] EVACUATION AND
RECHARGE”).
11) Attach the Solenoid Coil to the valve body, and secure it with the screw.
12) Connect the lead wires.
13) Re
fi
t the panels in their correct positions.
14) Plug in the icemaker or connect the power source.
Содержание KM-61BAH
Страница 16: ...11 ...
Страница 30: ...25 2 WIRING DIAGRAM a KM 61BAH ...
Страница 31: ...26 b KM 101BAH ...
Страница 32: ...27 c KM 151BAH KM 151BWH ...
Страница 83: ...78 Water Supply Inlet 1 2 FPT Drain Outlet 3 4 FPT Fig 34 KM 61BAH KM 101BAH KM 151BAH ...