17
[c] SEQUENCE
1st Cycle
1. Unit energized and Control Switch to “ICE”
position. Water supply cycle starts.
2. After 1 minute,
Defrost cycle starts.
3. Thermistor reads 48° F.
Defrost Timer starts counting.
IMPORTANT
Water Valve
opening is limited
to 6 minutes.
&
5. After the first 5 minutes in freeze cycle.
Ready to complete freeze cycle when Float
Switch circuit opens.
4. Defrost Timer stops counting.
Defrost cycle is completed and freeze cycle
starts.
IMPORTANT
Board never accepts freeze completion signal
within the first 5 minutes in freeze cycle.
IMPORTANT
1. Board never accepts defrost completion
signal within the first 2 minutes in defrost
cycle.
2. Defrost cycle time is limited to 20 minutes
even if Defrost Timer does not stop counting.
Содержание KM-500MAF
Страница 25: ...25 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT a KM 500MAF ...
Страница 26: ...26 b KM 500MWF ...
Страница 27: ...27 c KM 500MRF ...
Страница 28: ...28 2 WIRING DIAGRAMS a KM 500MAF and KM 500MWF Note Pressure Switch Cut out 412 PSIG Cut in 327 21 PSIG 21 0 ...
Страница 29: ...29 b KM 500MRF U1GMA0179608 Note Pressure Switch Cut out 412 PSIG Cut in 327 21 PSIG 21 0 ...