21
[b] SANITIZING PROCEDURE - Following Cleaning Procedure
1) Dilute approximately 1.5 fl. oz. of a 5.25% Sodium Hypochlorite solution with 3 gal. of
water.
2) Remove the Insulation Panel.
3) Pour the sanitizing solution into the Water Tank. See Fig. 9.
4) Replace the Insulation Panel and the Front Panel in their correct positions.
Note: Make sure that the Control Switch is in the “WASH” position and
the Cleaning Valve is open.
5) Turn on the power supply, and start the sanitizing process.
6) Turn off the power supply after 15 minutes.
7) Remove the Front Panel.
8) Remove one end of the Pump Tubing. Drain the Water Tank. Replace the Pump Tubing
in its correct position.
9) Repeat the above steps 14) through 25) in “[a] CLEANING PROCEDURE” two times to
rinse thoroughly.
10) Close the Cleaning Valve.
11) Move the Control Switch to the “ICE” position.
12) Replace the Front Panel and the Base Cover in their correct positions.
13) Clean the Storage Bin with water.
14) Turn on the power supply, and start the automatic icemaking process.
Содержание KM-280MAH
Страница 6: ...6 2 DIMENSIONS CONNECTIONS a KM 280MAH Unit inches mm ...
Страница 7: ...7 b KM 280MWH Unit inches mm ...
Страница 12: ...12 KM 280MWH Fig 4 KM 280MAH ...