57
10. PERFORMANCE DATA
[a] FM-481AGE-HC
0
2
4
6
8
10
12
14
16
18
10/10
21/15
32/21
Ambient Temp/Water Temp(℃)
H
e
ad
P
re
ss
u
re
(b
ar
)
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
S
u
c
ti
o
n
P
res
su
re
(b
ar
)
Head Pressure1(bar)
Head Pressure2(bar)
Suction Pressure1(bar)
Suction Pressure2(bar)
0
50
100
150
200
250
300
350
400
450
500
10/10
21/15
32/21
Ambient Temp/Water Temp(℃)
Ice
P
ro
duct
io
n
C
sp
sci
ty
(k
g/
da
y)
Ice Production
Capacity(kg/day)
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
10/10
21/15
32/21
Ambient Temp/Water Temp(℃)
W
a
te
r
Co
ns
um
pt
io
n
Water
Consumption
Содержание FM-300AFE-HC
Страница 7: ...3 2 DIMENSIONS CONNECTIONS a FM 481AGE HC FM 481AGE HCN ...
Страница 8: ...4 b FM 300AFE HC FM 300AFE HCN ...
Страница 9: ...5 3 SPECIFICATIONS a FM 481AGE HC ...
Страница 10: ...6 b FM 481AGE HCN ...
Страница 11: ...7 c FM 300AFE HC ...
Страница 12: ...8 d FM 300AFE HCN ...
Страница 14: ...10 Drier Ice Chute Pressure Switch ...
Страница 23: ...19 b FM 300AFE HC FM 300AFE HCN Pressure Switch Cut out 22 6 1 5 0 bar Cut in 15 7 1 5 bar ...
Страница 24: ...20 2 WIRING DIAGRAM a WIRING DIAGRAM FM 481AGE HC FM 481AGE HCN ...
Страница 25: ...21 FM 300AFE HC FM 300AFE HCN ...
Страница 26: ...22 b CONTROL BOX LAYOUT FM 481AGE HC FM 481AGE HCN ...
Страница 27: ...23 FM 300AFE HC FM 300AFE HCN ...
Страница 35: ...31 FM 300AFE HC FM 300AFE HCN ...
Страница 36: ...32 ...
Страница 37: ...33 c SEQUENCE FM 481AGE HC FM 481AGE HCN 1 Startup Water Supply ...
Страница 38: ...34 FM 481AGE HC FM 481AGE HCN 2 Startup After completion of water supply Gear Motor and Fan Motor start 5 min ...
Страница 39: ...35 FM 481AGE HC FM 481AGE HCN 3 Startup Ice production starts ...
Страница 40: ...36 FM 481AGE HC FM 481AGE HCN 4 Normal Operation Bin Control ...
Страница 41: ...37 FM 481AGE HC FM 481AGE HCN 5 Shutdown Compressor stops 5 min ...
Страница 42: ...38 FM 481AGE HC FM 481AGE HCN 6 Shutdown Drain ...
Страница 43: ...39 FM 300AFE HC FM 300AFE HCN 1 Startup Water Supply ...
Страница 44: ...40 FM 300AFE HC FM 300AFE HCN 2 Startup After completion of water supply Gear Motor and Fan Motor start 5 min ...
Страница 45: ...41 FM 300AFE HC FM 300AFE HCN 3 Startup Ice production starts ...
Страница 46: ...42 FM 300AFE HC FM 300AFE HCN 4 Normal Operation Bin Control ...
Страница 47: ...43 FM 300AFE HC FM 300AFE HCN 5 Shutdown Compressor stops 5 min ...
Страница 48: ...44 FM 300AFE HC FM 300AFE HCN 6 Shutdown Drain ...