73
13. REMOVAL AND REPLACEMENT OF EVAPORATOR PRESSURE
REGULATOR (E.P.R.) - F-2000MLF ONLY
1) Turn off the power supply.
2) Close the Shut-off Valves to the Compressor Rack Assembly.
3) Remove the panels.
4) Recover the refrigerant and store it in an approved container.
5) Remove the E.P.R. using brazing equipment.
6) Braze the new E.P.R. with nitrogen gas flowing at a pressure of 3 - 4 PSIG.
WARNING
Always protect the E.P.R. by using a damp cloth to prevent the E.P.R.
from overheating. Do not braze with the E.P.R. exceeding 250°F.
7) Insert the Valve Core into the Access Valve.
8) Check for leaks using nitrogen gas (140 PSIG)
and soap bubbles.
9) Evacuate the system.
10) Replace the panels in their correct position.
11) Open the Shut-off Valves to the Compressor
Rack Assembly.
12) Turn on the power supply.
Содержание F-2000MLF
Страница 14: ...14 2 CONDENSER UNIT URC 20F...
Страница 16: ...16 II GENERAL INFORMATION 1 CONSTRUCTION F 2000MLF C...
Страница 17: ...17 F 2000MRF3 C F 2000MRF C...
Страница 18: ...18 F 2000MWF C...
Страница 20: ...20 F 2000MWF F 2000MRF C...
Страница 21: ...21 F 2000MLF C...
Страница 22: ...22 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERATION CIRCUIT F 2000MLF C...
Страница 23: ...23 F 2000MRF3 C...
Страница 24: ...24 F 2000MWF C...
Страница 25: ...25 2 WIRING DIAGRAMS F 2000MLF C...
Страница 26: ...26 F 2000MRF3 C...
Страница 27: ...27 F 2000MWF C...
Страница 28: ...28 F 2000MRF C...
Страница 30: ...30 b When Reservoir has been filled Gear Motor starts immediately...
Страница 31: ...31 c Compressor starts F 2000MLF C only two solenoid valves open about 60 sec after Gear Motor starts...
Страница 33: ...33 e Low Water Except Water cooled Model where Compressor will operate intermittently...
Страница 39: ...39...
Страница 69: ...69...