37
Proper wiring. The unit starts.
BIN CONTROL
OFF ON
1. CIRCUIT PROTECT
RELAY
2. WATER LEVEL
3. FLOAT
SWITCH
UPPER
LOWER
4. WATER CONTROL
RELAY
5. CONTROL WATER
VALVE
6. FLUSH TIMER
7. FLUSH SWITCH
8. FLUSH WATER
VALVE
9. BIN CONTROL
10. GEAR MOTOR
RELAY
11. GEAR MOTOR
12. FAN MOTOR
13. COMPRESSOR OR
TWO SOLENOID
VALVES (2000MLF(-C))
14. PRESSURE
SWITCH
15. HEATER
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
1 - 2
2 - 3
FLUSH
ICE
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
1 sec
60 sec
6 sec
1 sec
60 sec
UPPER
LOWER
BOTTOM
4. TIMING CHART
Содержание F-2000MLF
Страница 14: ...14 2 CONDENSER UNIT URC 20F...
Страница 16: ...16 II GENERAL INFORMATION 1 CONSTRUCTION F 2000MLF C...
Страница 17: ...17 F 2000MRF3 C F 2000MRF C...
Страница 18: ...18 F 2000MWF C...
Страница 20: ...20 F 2000MWF F 2000MRF C...
Страница 21: ...21 F 2000MLF C...
Страница 22: ...22 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERATION CIRCUIT F 2000MLF C...
Страница 23: ...23 F 2000MRF3 C...
Страница 24: ...24 F 2000MWF C...
Страница 25: ...25 2 WIRING DIAGRAMS F 2000MLF C...
Страница 26: ...26 F 2000MRF3 C...
Страница 27: ...27 F 2000MWF C...
Страница 28: ...28 F 2000MRF C...
Страница 30: ...30 b When Reservoir has been filled Gear Motor starts immediately...
Страница 31: ...31 c Compressor starts F 2000MLF C only two solenoid valves open about 60 sec after Gear Motor starts...
Страница 33: ...33 e Low Water Except Water cooled Model where Compressor will operate intermittently...
Страница 39: ...39...
Страница 69: ...69...