![horsch Pronto 6 NT Скачать руководство пользователя страница 82](http://html1.mh-extra.com/html/horsch/pronto-6-nt/pronto-6-nt_operating-instructions-manual_2164111082.webp)
Maintenance overview
Maintenance location
Work instructions
Interval
After 10 operating hours
Retighten all screw and plug-in
connections as well as the hydraulic
connections.
Even firmly tightened screw connections can come loose (e.g.
because of material settlement or paint residues between the
screw elements). This can lead to loose screw connections
and leaking hydraulic connections.
once
Retighten all wheel nuts
M18 x 1.5 - 300 Nm
M22 x 1.5 - 510 Nm
¾
initially after 10 hours or 50 km.
¾
again after 10 hours or 50 km.
¾
then retighten daily until the screws have settled and further tightening
is no longer possible.
¾
then always before the start of the season and every 50 operating
hours during use.
Before the season
Complete machine
Read the operating instructions carefully as a refresher.
Check all screw connections for firm seating and retighten as
necessary.
Check condition and function of all protective features and
replace, if necessary.
In use
Hydraulics
WARNING
Lower all hydraulically lifted parts (e.g. wings, packer, undercarriage,
etc.) to the ground before performing any work on the hydraulic system.
Depressurise the hydraulics on the tractor and implement side!
Allow the hydraulic oil and hydraulic components (e.g. fan motor), which
have become hot during operation, to cool down before performing any
work on the hydraulic system.
Hydraulic system and components
Check all hydraulic components and hoses for function,
leak tightness and fastening.
40 h
Hydraulic hoses
Check the hydraulic hoses regularly for damage (cracks, chafing, etc.).
Replace damaged and faulty hoses immediately.
Hydraulic hoses must be replaced after 6 years. Pay attention to the
manufacturing date on the crimp sleeve (year/month) and the hose
(quarter/year):
Crimp sleeve
Hose
Depending on the conditions of use (e.g. weather influences) or in case
of higher strains on the machine the hoses may need to be replaced
earlier.
Have the hydraulic system checked by an expert at least once every
year.
In addition follow the country specific regulations and directives.
Electrics
Electrical lines
Check for damage.
40 h
Pronto 6 / 8 / 9 NT
78
Содержание Pronto 6 NT
Страница 2: ......
Страница 5: ......
Страница 22: ...Filling auger 18...
Страница 53: ...Tightening torques on the coulter 20 Nm 55 Nm 38 Nm 20 5 Nm 100 Nm 5 Nm 49...
Страница 95: ......