Horne Engineering Ltd
Issue 4 June 2016
15
IN-SERVICE TESTING RECORD
(Note: Photocopy this page)
In-Service Testing Record
Establishment: Location of Valve:
Date: Type of Valve : TSV1-3 Shower Valve
Hot Water Supply :
HW Temp C
HW Pressure
Bar Temp:
Instrumentation:
Pressure:
Cold Water Supply:
CW Temp C
CW Pressure
Bar
Mixed Temp at max draw-off: Mixed Temp: C
Flowrate at max draw-off: l/min
Mixed Temp at low draw-off:
Mixed Temp: C
Flowrate at low draw-off: l/min
Instrumentation Used:
Temp:
Press:
Flow:
Cold Water Isolation Test
Max Mixed Water Temp during CW Isolation test: C Mixed Water Temp on restoration of CW Supply: C
Note: MWT should return within 2 degrees of set temp, and be no greater than 43C after this test.
Comments:
Recommended Date of Next In-Service Test:
In-Service Testing Record
Establishment: Location of Valve:
Date: Type of Valve : TSV1-3 Shower Valve
Hot Water Supply :
HW Temp C
HW Pressure
Bar Temp:
Instrumentation:
Pressure:
Cold Water Supply:
CW Temp C
CW Pressure
Bar
Mixed Temp at max draw-off: Mixed Temp: C
Flowrate at max draw-off: l/min
Mixed Temp at low draw-off:
Mixed Temp: C
Flowrate at low draw-off: l/min
Instrumentation Used:
Temp:
Press:
Flow:
Cold Water Isolation Test
Max Mixed Water Temp during CW Isolation test: C Mixed Water Temp on restoration of CW Supply: C
Note: MWT should return within 2 degrees of set temp, and be no greater than 43C after this test.
Comments:
Recommended Date of Next In-Service Test: