background image

Horne Engineering Ltd 

Issue 4 June 2016 

 

 

 

5

 

Fig 5 

 

8)  Flush the Pipework 

Flush out the pipework in accordance with Water Bylaws 2000 (Scotland) and BS 6700:1997 (England 
& Wales).  The use of a Horne flushing kit is strongly recommended, because this connects directly to 
the water inlets on the mixing valve.  Access to the flushing points is gained from underneath the 
casing through the lower end cap.  Using the supplied 4mm hex key, isolate the cold and hot water 
supplies at the low level servicing valves.  Remove the strainer cap and strainer basket and screw in 
the flushing adapter.  Place the end of the flushing hose in an appropriate drain or container and turn 
on the supply to flush as required.  Remove the flushing adapter and replace the strainer cap.  Repeat 
for both hot and cold supplies.  See Figs 6 & 7. 
 

NOTE THAT IF THERE IS ANY DANGER OF FREEZING THEN THE PIPES AND TSV1-3 MUST BE 
DRAINED TO AVOID DAMAGE.

 

 

 

Содержание TSV1-3

Страница 1: ...mmended supply pressure is 6 bar 90 psi 60m head for hot and 10 bar 150 psi 100m head for the cold Supply Water Temperature Requirements Max Hot Water Temperature 65 C Min Hot Water Temperature 55 C M...

Страница 2: ...e wall that is on the required centreline for the casing 15mm below the line of the top of the casing for the support screw see Fig 1 2 Install the Support Screw Drill a 7 0mm dia hole in the wall and...

Страница 3: ...el to the Wall Carefully re hang the panel on the temporary screw and then attach it firmly to the wall by the four other screws Put the four supplied screw bushes in the mounting holes in the panel a...

Страница 4: ...anel is replaced prior to connecting up the supply pipes Connect the hot water supply to the left hand inlet and cold water to the right hand inlet see Fig 5 DO NOT OPEN THE WATER SUPPLIES AT THIS STA...

Страница 5: ...th the casing through the lower end cap Using the supplied 4mm hex key isolate the cold and hot water supplies at the low level servicing valves Remove the strainer cap and strainer basket and screw i...

Страница 6: ...st the temperature control and check for any water leaks upstream of the TSV1 3 valve Make good any leaks found The valve is now ready for commissioning Note that if the controls enclosure and shower...

Страница 7: ...lies may have to be connected before the pre plumbed enclosure is attached to the wall Accordingly point 7 on the attached installation instructions Connect the Supply Pipes should be performed before...

Страница 8: ...not been altered and to ensure user safety If the maximum temperature requires adjustment remove the temperature control cap using a sharp blade or the tip of a penknife and adjust the small slotted...

Страница 9: ...h contain O rings and or the thermostatic element are available Smear all O rings with silicon grease oil prior to installing them Torque the TSV1 3 cover to 13 Nm 10 lbft This is to prevent the user...

Страница 10: ...k valves and strainer basket should be replaced It is not possible to satisfactorily remove the check valves itself from the inlet elbow and should not be attempted The shower valve body must be remov...

Страница 11: ...be undetectable in normal use and only become apparent when disruption occurs in the hot or cold water supply temperatures or pressures The frequency of in service testing depends upon the condition...

Страница 12: ...Horne Engineering Ltd Issue 4 June 2016 12 Insert DRAWING 10393 showing position of Flow Reg...

Страница 13: ...Horne Engineering Ltd Issue 4 June 2016 13...

Страница 14: ...ax Mixed Water Temp during CW Isolation test C Mixed Water Temp on restoration of CW Supply C Note MWT should return within 2 degrees of set temp and be no greater than 43C after this test Comments In...

Страница 15: ...C Note MWT should return within 2 degrees of set temp and be no greater than 43C after this test Comments Recommended Date of Next In Service Test In Service Testing Record Establishment Location of V...

Страница 16: ...neering Ltd Issue 4 June 2016 16 Brochure Ref L 180 Horne Engineering Ltd PO Box 7 Rankine Street Johnstone SCOTLAND PA5 8BD Tel 44 0 1505 321455 Fax 44 0 1505 336287 Email Technical horne co uk www h...

Отзывы: