![Horizon Fitness Perfect Binder BQ-260 Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/horizon-fitness/perfect-binder-bq-260/perfect-binder-bq-260_manual_2162393077.webp)
71
9. Installation of Suction Cover Feeder CF-260
9-2 Set Up and Operation
9-2-1 Cover Piling
Bin Up Button
One Cycle Button
Front Guide
Back Guide
Side Guide
1.
Turn on power switch.
-Power lamp turns on.
2.
Press table lower button.
-Table lowers and stops at lowest position.
3.
Pile covers so that covers touch front
guide and side guide.
NOTE
- Straighten covers before piling. Wavy or
curled cover will cause inferior feeding such
as misfeed.
- Do not pile covers more than 10 cm.
4.
Place back guide at right corner of cover
on table.
5.
Press table up button.
-Table rises and stops at feeding position.
6.
Press one cycle button. Sucker bar
moves forward and then stops.
This procedure shows cover piling before
starting binding.
WARNING
Do not touch moving parts parts. Mov-
ing parts may cause severe personal
injury.
CAUTION
Do not place books, tools and so on
under table. They may cause machine
damage.
Table Lower Button
Содержание Perfect Binder BQ-260
Страница 6: ...VI This page is intentionally left blank...
Страница 14: ...8 1 Machine Parts Descriptions This page is intentionally left blank...
Страница 15: ...9 2 Installation Instructions 2 Installation Instructions 2 1 Installation Instructions 10...
Страница 26: ...20 3 Before Starting Operation This page is intentionally left blank...
Страница 42: ...36 4 Set Up BQ 260 This page is intentionally left blank...
Страница 43: ...37 5 Operation Procedure 5 Operation Procedure 5 1 With Cover Binding Operation 38 5 2 Pad Binding 39...
Страница 48: ...42 5 Operation Procedure This page is intentionally left blank...
Страница 67: ...61 8 maintenance 8 Maintenance 8 1 Once A Month 62 8 2 As Required 63...