![Horizon Fitness Perfect Binder BQ-260 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/horizon-fitness/perfect-binder-bq-260/perfect-binder-bq-260_manual_2162393047.webp)
41
5. Operation Procedure
5-1
Followings are process of pad binding
(with milling).
1) Stock is clamped with clamper and
transported to milling unit and milled off
spine.
2) Stock is transported to home position and
clamper is automatically opened on level
plate to rejog stock.
3) Stock is applied glue on melt tank unit.
4) Stock is stopped over nipping unit for
several seconds to dry glue.
5) Stock is transported to home position
through over lowered melt tank unit.
6) Stock is released from clamper.
5-2
Followings are process of pad binding
(without cover)
1) Stock is clamped with clamper and
transported to melt tank unit.
2) Stock is applied glue on melt tank unit.
3) Stock is stopped over nipping unit for
several seconds to dry glue.
4) Stock is transported to home position
through over lowered melt tank unit.
5) Stock is released from clamper.
5-2 Pad Binding
Содержание Perfect Binder BQ-260
Страница 6: ...VI This page is intentionally left blank...
Страница 14: ...8 1 Machine Parts Descriptions This page is intentionally left blank...
Страница 15: ...9 2 Installation Instructions 2 Installation Instructions 2 1 Installation Instructions 10...
Страница 26: ...20 3 Before Starting Operation This page is intentionally left blank...
Страница 42: ...36 4 Set Up BQ 260 This page is intentionally left blank...
Страница 43: ...37 5 Operation Procedure 5 Operation Procedure 5 1 With Cover Binding Operation 38 5 2 Pad Binding 39...
Страница 48: ...42 5 Operation Procedure This page is intentionally left blank...
Страница 67: ...61 8 maintenance 8 Maintenance 8 1 Once A Month 62 8 2 As Required 63...