58
7. After Binding Finish
Dust bag must be empty after binding fin-
ished.
1.
Remove dust bag and dump dust from
dust bag.
2.
Knot strings of dust bag on exhaust duct
on BQ-260.
7-3 Clean Up after Power Off
7-3-1 Dust Bag Clean Up
Dust Bag
Strings
Stacker
Exhaust Duct
Stacker must be cleaned after power off.
1.
Pull out stacker fully to outside.
2.
Clean stacker with soft cloth.
7-3-2 Vertical Stacker Unit Clean Up
Содержание Perfect Binder BQ-260
Страница 6: ...VI This page is intentionally left blank...
Страница 14: ...8 1 Machine Parts Descriptions This page is intentionally left blank...
Страница 15: ...9 2 Installation Instructions 2 Installation Instructions 2 1 Installation Instructions 10...
Страница 26: ...20 3 Before Starting Operation This page is intentionally left blank...
Страница 42: ...36 4 Set Up BQ 260 This page is intentionally left blank...
Страница 43: ...37 5 Operation Procedure 5 Operation Procedure 5 1 With Cover Binding Operation 38 5 2 Pad Binding 39...
Страница 48: ...42 5 Operation Procedure This page is intentionally left blank...
Страница 67: ...61 8 maintenance 8 Maintenance 8 1 Once A Month 62 8 2 As Required 63...