Appendix
Batteries_Rail_Power_Manual_en02.docx
47
13.2.3. Maintenance interval 4 years
13.2.3.1.
Maintenance - measuring the open-circuit voltage on each battery block /
cell
Cell / Block No.
Open-Circuit voltage
[V]
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
*
*if more than 20 cells / blocks are installed, enlarge the table accordingly
Date: ______________________
Inspector: ______________________